最小化三个协作代理的总加权完成时间

Wen-Chiung Lee, Jen-Ya Wang
{"title":"最小化三个协作代理的总加权完成时间","authors":"Wen-Chiung Lee, Jen-Ya Wang","doi":"10.1109/IIAI-AAI.2018.00129","DOIUrl":null,"url":null,"abstract":"In the field of job scheduling, multi-agent scheduling has been studied for years. Past research focused on only two agents and how they compete for limited resources. In this study, we introduce a three-agent scheduling problem. In the problem, these agents can cooperate on minimizing the total weighted completion time. Experimental results show that these cooperating agents achieve lower objective costs and shorter processing times.","PeriodicalId":309975,"journal":{"name":"2018 7th International Congress on Advanced Applied Informatics (IIAI-AAI)","volume":"89 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Minimizing the Total Weighted Completion Time for Three Cooperating Agents\",\"authors\":\"Wen-Chiung Lee, Jen-Ya Wang\",\"doi\":\"10.1109/IIAI-AAI.2018.00129\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the field of job scheduling, multi-agent scheduling has been studied for years. Past research focused on only two agents and how they compete for limited resources. In this study, we introduce a three-agent scheduling problem. In the problem, these agents can cooperate on minimizing the total weighted completion time. Experimental results show that these cooperating agents achieve lower objective costs and shorter processing times.\",\"PeriodicalId\":309975,\"journal\":{\"name\":\"2018 7th International Congress on Advanced Applied Informatics (IIAI-AAI)\",\"volume\":\"89 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 7th International Congress on Advanced Applied Informatics (IIAI-AAI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IIAI-AAI.2018.00129\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 7th International Congress on Advanced Applied Informatics (IIAI-AAI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IIAI-AAI.2018.00129","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在作业调度领域,多智能体调度已经研究多年。过去的研究只关注两个代理人,以及他们如何争夺有限的资源。在本研究中,我们引入了一个三智能体调度问题。在这个问题中,这些代理可以在最小化总加权完成时间上进行合作。实验结果表明,这些协作代理实现了较低的目标成本和较短的处理时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Minimizing the Total Weighted Completion Time for Three Cooperating Agents
In the field of job scheduling, multi-agent scheduling has been studied for years. Past research focused on only two agents and how they compete for limited resources. In this study, we introduce a three-agent scheduling problem. In the problem, these agents can cooperate on minimizing the total weighted completion time. Experimental results show that these cooperating agents achieve lower objective costs and shorter processing times.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信