油气勘探钻机变换器驱动对供电网影响的特殊性

R. Kowal, R. Muszynski
{"title":"油气勘探钻机变换器驱动对供电网影响的特殊性","authors":"R. Kowal, R. Muszynski","doi":"10.1109/CPE.2009.5156030","DOIUrl":null,"url":null,"abstract":"In the paper the specific features of influence on supply grid of the drill rig converter drive, exploited by the oil and gas exploration enterprises, are presented. Due to high power and irregular operation of thyristor drives, on the one hand, and the low short-circuit power of the distribution network supplying usually the drill rigs, on the other hand, the serious disturbance arises, after connection the rigs to the distribution line. The problem is analyzed for the real situation of two drill rigs. On the base of measurement material and theoretical analysis related to power and harmonics in the network node, the suitable compensation system is designed, using the special simulation software elaborated at Poznan University of Technology.","PeriodicalId":272748,"journal":{"name":"2009 Compatibility and Power Electronics","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Specificity of influence on supply grid of the drill rig converter drives for oil and gas exploration\",\"authors\":\"R. Kowal, R. Muszynski\",\"doi\":\"10.1109/CPE.2009.5156030\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the paper the specific features of influence on supply grid of the drill rig converter drive, exploited by the oil and gas exploration enterprises, are presented. Due to high power and irregular operation of thyristor drives, on the one hand, and the low short-circuit power of the distribution network supplying usually the drill rigs, on the other hand, the serious disturbance arises, after connection the rigs to the distribution line. The problem is analyzed for the real situation of two drill rigs. On the base of measurement material and theoretical analysis related to power and harmonics in the network node, the suitable compensation system is designed, using the special simulation software elaborated at Poznan University of Technology.\",\"PeriodicalId\":272748,\"journal\":{\"name\":\"2009 Compatibility and Power Electronics\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-05-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Compatibility and Power Electronics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPE.2009.5156030\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Compatibility and Power Electronics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPE.2009.5156030","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了油气勘探企业开发的钻机变换器驱动对电网影响的具体特点。由于晶闸管驱动功率大、运行不规律,通常为钻机供电的配电网短路功率小,钻机接入配电网后会产生严重的扰动。结合两台钻机的实际情况,对问题进行了分析。在对网络节点功率和谐波相关的测量资料和理论分析的基础上,利用波兹南理工大学开发的专用仿真软件,设计了合适的补偿系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Specificity of influence on supply grid of the drill rig converter drives for oil and gas exploration
In the paper the specific features of influence on supply grid of the drill rig converter drive, exploited by the oil and gas exploration enterprises, are presented. Due to high power and irregular operation of thyristor drives, on the one hand, and the low short-circuit power of the distribution network supplying usually the drill rigs, on the other hand, the serious disturbance arises, after connection the rigs to the distribution line. The problem is analyzed for the real situation of two drill rigs. On the base of measurement material and theoretical analysis related to power and harmonics in the network node, the suitable compensation system is designed, using the special simulation software elaborated at Poznan University of Technology.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信