{"title":"基于LSM的铁路建设工期计算模型研究","authors":"Liqiang Liu, Yisheng Liu, Yuanjie Tang","doi":"10.1109/LISS.2015.7369805","DOIUrl":null,"url":null,"abstract":"Reasonable duration is very important in terms of construction. This study presents a new model for calculate the railway construction project duration by means of linear Scheduling method. It gives two kinds of activity combination, the two respectively the calculation method of combination of the construction duration. And the duration of the validity of the proposed method are determined verified by an actual railway project instance.","PeriodicalId":124091,"journal":{"name":"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Study on duration calculate model of railway construction based on LSM\",\"authors\":\"Liqiang Liu, Yisheng Liu, Yuanjie Tang\",\"doi\":\"10.1109/LISS.2015.7369805\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Reasonable duration is very important in terms of construction. This study presents a new model for calculate the railway construction project duration by means of linear Scheduling method. It gives two kinds of activity combination, the two respectively the calculation method of combination of the construction duration. And the duration of the validity of the proposed method are determined verified by an actual railway project instance.\",\"PeriodicalId\":124091,\"journal\":{\"name\":\"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-07-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/LISS.2015.7369805\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/LISS.2015.7369805","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Study on duration calculate model of railway construction based on LSM
Reasonable duration is very important in terms of construction. This study presents a new model for calculate the railway construction project duration by means of linear Scheduling method. It gives two kinds of activity combination, the two respectively the calculation method of combination of the construction duration. And the duration of the validity of the proposed method are determined verified by an actual railway project instance.