电力线通信市电过零周期测量平台

Souha Souissi, Ons Ben Rhouma, C. Rebai
{"title":"电力线通信市电过零周期测量平台","authors":"Souha Souissi, Ons Ben Rhouma, C. Rebai","doi":"10.1109/I2MTC.2014.6860520","DOIUrl":null,"url":null,"abstract":"This paper investigates the mains signal behavior and non-idealities impact on zero crossing (ZC) signal already used for synchronization purpose in powerline communication (PLC) systems. A design of analog and digital stage for an experimental measurement platform is proposed to evaluate mains ZC periodicity with real conditions. Measurements were performed in real different environment: in lab, in home and in rural location to discern the particularity of each one of them. The proposed measurement procedure is also detailed. Obtained experimental results have shown that ZC detection present fluctuations composed of two components (stationary and impulsive). In impulsive one, four types of errors have been identified and analyzed for each environment. Measured errors shows fluctuant ZC periods sweep between 0.5ms and 10.2ms.","PeriodicalId":331484,"journal":{"name":"2014 IEEE International Instrumentation and Measurement Technology Conference (I2MTC) Proceedings","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Measurement platform of mains zero crossing period for powerline communication\",\"authors\":\"Souha Souissi, Ons Ben Rhouma, C. Rebai\",\"doi\":\"10.1109/I2MTC.2014.6860520\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper investigates the mains signal behavior and non-idealities impact on zero crossing (ZC) signal already used for synchronization purpose in powerline communication (PLC) systems. A design of analog and digital stage for an experimental measurement platform is proposed to evaluate mains ZC periodicity with real conditions. Measurements were performed in real different environment: in lab, in home and in rural location to discern the particularity of each one of them. The proposed measurement procedure is also detailed. Obtained experimental results have shown that ZC detection present fluctuations composed of two components (stationary and impulsive). In impulsive one, four types of errors have been identified and analyzed for each environment. Measured errors shows fluctuant ZC periods sweep between 0.5ms and 10.2ms.\",\"PeriodicalId\":331484,\"journal\":{\"name\":\"2014 IEEE International Instrumentation and Measurement Technology Conference (I2MTC) Proceedings\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-05-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE International Instrumentation and Measurement Technology Conference (I2MTC) Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/I2MTC.2014.6860520\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Instrumentation and Measurement Technology Conference (I2MTC) Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/I2MTC.2014.6860520","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文研究了电力线通信(PLC)系统中用于同步的过零信号的特性及其非理想性对过零信号的影响。提出了一种模拟与数字相结合的实验测量平台设计方案,用于在实际条件下评估市电ZC周期性。测量是在真实不同的环境中进行的:在实验室,在家里和在农村的位置,以辨别每一个的特殊性。建议的测量程序也详细。得到的实验结果表明,ZC检测存在由平稳和脉冲两部分组成的波动。在脉冲一中,针对每种环境识别并分析了四种类型的误差。测量误差显示ZC周期在0.5ms和10.2ms之间波动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Measurement platform of mains zero crossing period for powerline communication
This paper investigates the mains signal behavior and non-idealities impact on zero crossing (ZC) signal already used for synchronization purpose in powerline communication (PLC) systems. A design of analog and digital stage for an experimental measurement platform is proposed to evaluate mains ZC periodicity with real conditions. Measurements were performed in real different environment: in lab, in home and in rural location to discern the particularity of each one of them. The proposed measurement procedure is also detailed. Obtained experimental results have shown that ZC detection present fluctuations composed of two components (stationary and impulsive). In impulsive one, four types of errors have been identified and analyzed for each environment. Measured errors shows fluctuant ZC periods sweep between 0.5ms and 10.2ms.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信