通过缩短设置时间实现竞争力

Minerva Mayela Orta-Lozano, B. Villarreal
{"title":"通过缩短设置时间实现竞争力","authors":"Minerva Mayela Orta-Lozano, B. Villarreal","doi":"10.1109/IEOM.2015.7093897","DOIUrl":null,"url":null,"abstract":"This paper has the purpose of describing the efforts of a Mexican company with several galvanizing lines, located in Monterrey, Mexico, to diminish setup time. The firm's operations strategy requires a better performance of the plant in terms of line capacity utilization, more productivity and quicker response to market's orders. The setup reduction project set to obtain those goals was organized to attack two fronts; The reduction of the time per setup, and the decrease of the number of setups.","PeriodicalId":410110,"journal":{"name":"2015 International Conference on Industrial Engineering and Operations Management (IEOM)","volume":"2012 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-03-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Achieving competitiveness through setup time reduction\",\"authors\":\"Minerva Mayela Orta-Lozano, B. Villarreal\",\"doi\":\"10.1109/IEOM.2015.7093897\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper has the purpose of describing the efforts of a Mexican company with several galvanizing lines, located in Monterrey, Mexico, to diminish setup time. The firm's operations strategy requires a better performance of the plant in terms of line capacity utilization, more productivity and quicker response to market's orders. The setup reduction project set to obtain those goals was organized to attack two fronts; The reduction of the time per setup, and the decrease of the number of setups.\",\"PeriodicalId\":410110,\"journal\":{\"name\":\"2015 International Conference on Industrial Engineering and Operations Management (IEOM)\",\"volume\":\"2012 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-03-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Industrial Engineering and Operations Management (IEOM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEOM.2015.7093897\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Industrial Engineering and Operations Management (IEOM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEOM.2015.7093897","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

本文的目的是描述一个墨西哥公司的努力与几个镀锌线,位于蒙特雷,墨西哥,以减少设置时间。公司的运营战略要求工厂在生产线产能利用率、生产率和对市场订单的更快响应方面有更好的表现。为实现这些目标而设置的设置减少项目被组织为两条战线;每次设置时间的减少,以及设置次数的减少。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Achieving competitiveness through setup time reduction
This paper has the purpose of describing the efforts of a Mexican company with several galvanizing lines, located in Monterrey, Mexico, to diminish setup time. The firm's operations strategy requires a better performance of the plant in terms of line capacity utilization, more productivity and quicker response to market's orders. The setup reduction project set to obtain those goals was organized to attack two fronts; The reduction of the time per setup, and the decrease of the number of setups.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信