{"title":"引入风险控制因素和具体环境任务的输变配电设备安全评价","authors":"Hai Yu, Leiming Yao, Zhimin Qin, Zhenguo Liu, Limin Yang, Sirui Zhu, Wuliang Zhang","doi":"10.1109/CEECT55960.2022.10030612","DOIUrl":null,"url":null,"abstract":"Aiming at the problems of traditional LEC, such as being too subjective, lacking in comprehensive evaluation and universality, this paper proposes an improved LEC method with the introduction of risk control factors, which comprehensively uses the four elements of people, materials, environment and management, fully considers the social and economic factors of the power system. This method can reduce the distortion rate, ensure the objective reliability of the results, and achieve the quantitative evaluation and classification of the hazard sources of power transmission and distribution equipment. Finally, the method is verified based on the previous accident case data of Xinjiang power grid, which provides a new idea for the safety evaluation of power transmission, transformation and distribution equipment.","PeriodicalId":187017,"journal":{"name":"2022 4th International Conference on Electrical Engineering and Control Technologies (CEECT)","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Safety Evaluation of Power Transmission, Transformation and Distribution Equipments by Introducing Risk Control Factors and Specific Environmental Assignments\",\"authors\":\"Hai Yu, Leiming Yao, Zhimin Qin, Zhenguo Liu, Limin Yang, Sirui Zhu, Wuliang Zhang\",\"doi\":\"10.1109/CEECT55960.2022.10030612\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Aiming at the problems of traditional LEC, such as being too subjective, lacking in comprehensive evaluation and universality, this paper proposes an improved LEC method with the introduction of risk control factors, which comprehensively uses the four elements of people, materials, environment and management, fully considers the social and economic factors of the power system. This method can reduce the distortion rate, ensure the objective reliability of the results, and achieve the quantitative evaluation and classification of the hazard sources of power transmission and distribution equipment. Finally, the method is verified based on the previous accident case data of Xinjiang power grid, which provides a new idea for the safety evaluation of power transmission, transformation and distribution equipment.\",\"PeriodicalId\":187017,\"journal\":{\"name\":\"2022 4th International Conference on Electrical Engineering and Control Technologies (CEECT)\",\"volume\":\"34 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 4th International Conference on Electrical Engineering and Control Technologies (CEECT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CEECT55960.2022.10030612\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 4th International Conference on Electrical Engineering and Control Technologies (CEECT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CEECT55960.2022.10030612","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

针对传统LEC过于主观、缺乏综合评价和普适性等问题,本文提出了一种引入风险控制因素的改进LEC方法,综合运用人、物、环境、管理四要素,充分考虑电力系统的社会经济因素。该方法可以降低失真率,保证结果的客观可靠性,实现输配电设备危险源的定量评价和分类。最后,结合新疆电网以往事故案例数据对该方法进行了验证,为输变配电设备安全评价提供了新的思路。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Safety Evaluation of Power Transmission, Transformation and Distribution Equipments by Introducing Risk Control Factors and Specific Environmental Assignments
Aiming at the problems of traditional LEC, such as being too subjective, lacking in comprehensive evaluation and universality, this paper proposes an improved LEC method with the introduction of risk control factors, which comprehensively uses the four elements of people, materials, environment and management, fully considers the social and economic factors of the power system. This method can reduce the distortion rate, ensure the objective reliability of the results, and achieve the quantitative evaluation and classification of the hazard sources of power transmission and distribution equipment. Finally, the method is verified based on the previous accident case data of Xinjiang power grid, which provides a new idea for the safety evaluation of power transmission, transformation and distribution equipment.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信