电气化开始运行

H. C. Griffith
{"title":"电气化开始运行","authors":"H. C. Griffith","doi":"10.1109/T-AIEE.1931.5055776","DOIUrl":null,"url":null,"abstract":"This paper describes the energizing and putting into service of the Pennsylvania electrification project. The normal and desirable procedure of placing an electrification into service is cited, and the departure from it brought about by the difficulties encountered in actual railway operation are explained. The operating practise — functions of the power director, his assistants, substation operators, and foremen in connection with switching operations, grounding circuits, carding of circuits and manner of obtaining releases — is described and illustrated. All of this is very essential to properly coordinate the work and safeguard the personnel of the construction forces, operating forces, and test men during the transition period of completion and placing into operation a railway electrification project.","PeriodicalId":260406,"journal":{"name":"Journal of the A.I.E.E.","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1931-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Initiation of an electrification into operation\",\"authors\":\"H. C. Griffith\",\"doi\":\"10.1109/T-AIEE.1931.5055776\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes the energizing and putting into service of the Pennsylvania electrification project. The normal and desirable procedure of placing an electrification into service is cited, and the departure from it brought about by the difficulties encountered in actual railway operation are explained. The operating practise — functions of the power director, his assistants, substation operators, and foremen in connection with switching operations, grounding circuits, carding of circuits and manner of obtaining releases — is described and illustrated. All of this is very essential to properly coordinate the work and safeguard the personnel of the construction forces, operating forces, and test men during the transition period of completion and placing into operation a railway electrification project.\",\"PeriodicalId\":260406,\"journal\":{\"name\":\"Journal of the A.I.E.E.\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1931-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the A.I.E.E.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/T-AIEE.1931.5055776\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the A.I.E.E.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/T-AIEE.1931.5055776","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

介绍了宾夕法尼亚州电气化工程的通电投运情况。列举了电气化投入使用的正常和理想的程序,并解释了铁路实际运营中遇到的困难所带来的偏离。操作规程-电力主管、他的助手、变电站操作员和工头在开关操作、接地电路、电路梳理和获得释放方式方面的功能-进行了描述和说明。这对于搞好铁路电气化工程竣工投运过渡期施工部队、操作部队和试验人员的工作协调和人员保障是十分必要的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Initiation of an electrification into operation
This paper describes the energizing and putting into service of the Pennsylvania electrification project. The normal and desirable procedure of placing an electrification into service is cited, and the departure from it brought about by the difficulties encountered in actual railway operation are explained. The operating practise — functions of the power director, his assistants, substation operators, and foremen in connection with switching operations, grounding circuits, carding of circuits and manner of obtaining releases — is described and illustrated. All of this is very essential to properly coordinate the work and safeguard the personnel of the construction forces, operating forces, and test men during the transition period of completion and placing into operation a railway electrification project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信