{"title":"加权多技能资源的项目调度问题:提高项目调度效率","authors":"Fawaz S. Al-Anzi, K. Al-Zamel, A. Allahverdi","doi":"10.1109/CISE.2010.5676870","DOIUrl":null,"url":null,"abstract":"In this paper, we present an extension of the classical Resource Constrained Project Scheduling Problem (RCPSP). We present a new type of resource constraints in which staff members are involved. We present a new model where staff members can have several skills with different proficiency, i.e., a staff member is able to perform more than one kind of activity as well as the time need is complete the task assign depends on the staff individual skill. We call this model the Weighted-Multi-Skill Project Scheduling Problem (WMSPSP). In our model, an activity has specific skill requirements that must be satisfied. To solve this problem we propose a lower bound that uses a linear programming scheme proposed for the RCPSP.","PeriodicalId":232832,"journal":{"name":"2010 International Conference on Computational Intelligence and Software Engineering","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Project Scheduling Problem with Weighted Multi-Skill Resources: Enhancing the Efficiency of Project Scheduling\",\"authors\":\"Fawaz S. Al-Anzi, K. Al-Zamel, A. Allahverdi\",\"doi\":\"10.1109/CISE.2010.5676870\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we present an extension of the classical Resource Constrained Project Scheduling Problem (RCPSP). We present a new type of resource constraints in which staff members are involved. We present a new model where staff members can have several skills with different proficiency, i.e., a staff member is able to perform more than one kind of activity as well as the time need is complete the task assign depends on the staff individual skill. We call this model the Weighted-Multi-Skill Project Scheduling Problem (WMSPSP). In our model, an activity has specific skill requirements that must be satisfied. To solve this problem we propose a lower bound that uses a linear programming scheme proposed for the RCPSP.\",\"PeriodicalId\":232832,\"journal\":{\"name\":\"2010 International Conference on Computational Intelligence and Software Engineering\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on Computational Intelligence and Software Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CISE.2010.5676870\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Computational Intelligence and Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CISE.2010.5676870","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文给出了经典的资源约束项目调度问题(RCPSP)的一个扩展。我们提出了一种涉及工作人员的新型资源限制。我们提出了一个新的模型,其中工作人员可以具有不同熟练程度的几种技能,即,工作人员能够执行多种活动以及完成任务所需的时间取决于工作人员的个人技能。我们将该模型称为加权多技能项目调度问题(WMSPSP)。在我们的模型中,活动具有必须满足的特定技能需求。为了解决这个问题,我们提出了一个下界,该下界使用了为RCPSP提出的线性规划方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Project Scheduling Problem with Weighted Multi-Skill Resources: Enhancing the Efficiency of Project Scheduling
In this paper, we present an extension of the classical Resource Constrained Project Scheduling Problem (RCPSP). We present a new type of resource constraints in which staff members are involved. We present a new model where staff members can have several skills with different proficiency, i.e., a staff member is able to perform more than one kind of activity as well as the time need is complete the task assign depends on the staff individual skill. We call this model the Weighted-Multi-Skill Project Scheduling Problem (WMSPSP). In our model, an activity has specific skill requirements that must be satisfied. To solve this problem we propose a lower bound that uses a linear programming scheme proposed for the RCPSP.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信