影响软件测试时间表的因素

Ossi Taipale, H. Kälviäinen, K. Smolander
{"title":"影响软件测试时间表的因素","authors":"Ossi Taipale, H. Kälviäinen, K. Smolander","doi":"10.1109/ASWEC.2006.27","DOIUrl":null,"url":null,"abstract":"The objective of this study was to identify and model constructs associated with over-runs in software testing time schedules. 40 industry experts from 30 organizational units were interviewed and conclusions were made using regression analysis. The analysis revealed that increased communication and interaction in the design phase between development and testing are associated with time schedule over-runs. This unexpected result may be either a consequence of more comprehensive testing with increased communication and interaction, leading to time schedule over-runs, or the testing time schedule is adjusted under project pressure because of underestimated testing resource needs. Lack of testing know-how was also associated with testing time schedule over-runs. The results of this study can be utilized in planning software testing time schedules.","PeriodicalId":285684,"journal":{"name":"Australian Software Engineering Conference (ASWEC'06)","volume":"115 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-04-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"20","resultStr":"{\"title\":\"Factors affecting software testing time schedule\",\"authors\":\"Ossi Taipale, H. Kälviäinen, K. Smolander\",\"doi\":\"10.1109/ASWEC.2006.27\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The objective of this study was to identify and model constructs associated with over-runs in software testing time schedules. 40 industry experts from 30 organizational units were interviewed and conclusions were made using regression analysis. The analysis revealed that increased communication and interaction in the design phase between development and testing are associated with time schedule over-runs. This unexpected result may be either a consequence of more comprehensive testing with increased communication and interaction, leading to time schedule over-runs, or the testing time schedule is adjusted under project pressure because of underestimated testing resource needs. Lack of testing know-how was also associated with testing time schedule over-runs. The results of this study can be utilized in planning software testing time schedules.\",\"PeriodicalId\":285684,\"journal\":{\"name\":\"Australian Software Engineering Conference (ASWEC'06)\",\"volume\":\"115 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-04-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"20\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Australian Software Engineering Conference (ASWEC'06)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ASWEC.2006.27\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Australian Software Engineering Conference (ASWEC'06)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASWEC.2006.27","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 20

摘要

本研究的目的是识别和建模与软件测试时间计划中超时相关的结构。对来自30个组织单位的40位行业专家进行访谈,采用回归分析得出结论。分析表明,在开发和测试之间的设计阶段,增加的沟通和交互与时间计划超支有关。这个意想不到的结果可能是更全面的测试与增加的沟通和交互的结果,导致时间计划超支,或者测试时间计划在项目压力下被调整,因为低估了测试资源需求。缺乏测试知识也与测试时间计划超支有关。本研究的结果可用于规划软件测试时间表。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Factors affecting software testing time schedule
The objective of this study was to identify and model constructs associated with over-runs in software testing time schedules. 40 industry experts from 30 organizational units were interviewed and conclusions were made using regression analysis. The analysis revealed that increased communication and interaction in the design phase between development and testing are associated with time schedule over-runs. This unexpected result may be either a consequence of more comprehensive testing with increased communication and interaction, leading to time schedule over-runs, or the testing time schedule is adjusted under project pressure because of underestimated testing resource needs. Lack of testing know-how was also associated with testing time schedule over-runs. The results of this study can be utilized in planning software testing time schedules.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信