考虑动态特性的不同类型dg的业务恢复

Mingyu Su, Yin Xu, Ying Wang, Jinghan He, Jinli Wang
{"title":"考虑动态特性的不同类型dg的业务恢复","authors":"Mingyu Su, Yin Xu, Ying Wang, Jinghan He, Jinli Wang","doi":"10.1109/CIEEC.2018.8745740","DOIUrl":null,"url":null,"abstract":"After major outages of distribution system, critical loads on distribution feeders can be locally restored by multiple types of distributed generators (DGs) before the utility power is available. However, due to the low inertia and small capacity of DGs, it may cause large disturbances when conducting switching operations, which may cause failure of restoration. In addition, dynamic characteristics of different types of DGs are different and should be considered in implementation of restoration strategies. This paper proposes a two-step restoration method to determine the sequence of switching operations, including startup of DGs, line switching operations and load pick-up, to mitigate transients caused by the switching operations. First, the operating point of the post-restoration system is identified by formulating the problem as a relaxed mixed-integer second-order conic program. Then, a restoration rule is proposed to determine the sequence of switching operations to reach the operating point. The entropy weight method is used to find the sequence of the startup of DGs considering the dynamic features of each DG. A 32-bus test feeder with several types of DGs is utilized to demonstrate the effectiveness of the proposed method.","PeriodicalId":329285,"journal":{"name":"2018 IEEE 2nd International Electrical and Energy Conference (CIEEC)","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Service Restoration Using Different Types of DGs Considering Dynamic Characteristics\",\"authors\":\"Mingyu Su, Yin Xu, Ying Wang, Jinghan He, Jinli Wang\",\"doi\":\"10.1109/CIEEC.2018.8745740\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"After major outages of distribution system, critical loads on distribution feeders can be locally restored by multiple types of distributed generators (DGs) before the utility power is available. However, due to the low inertia and small capacity of DGs, it may cause large disturbances when conducting switching operations, which may cause failure of restoration. In addition, dynamic characteristics of different types of DGs are different and should be considered in implementation of restoration strategies. This paper proposes a two-step restoration method to determine the sequence of switching operations, including startup of DGs, line switching operations and load pick-up, to mitigate transients caused by the switching operations. First, the operating point of the post-restoration system is identified by formulating the problem as a relaxed mixed-integer second-order conic program. Then, a restoration rule is proposed to determine the sequence of switching operations to reach the operating point. The entropy weight method is used to find the sequence of the startup of DGs considering the dynamic features of each DG. A 32-bus test feeder with several types of DGs is utilized to demonstrate the effectiveness of the proposed method.\",\"PeriodicalId\":329285,\"journal\":{\"name\":\"2018 IEEE 2nd International Electrical and Energy Conference (CIEEC)\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE 2nd International Electrical and Energy Conference (CIEEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CIEEC.2018.8745740\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE 2nd International Electrical and Energy Conference (CIEEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIEEC.2018.8745740","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在配电系统发生重大停电事故后,在市电未恢复供电前,可通过多种分布式发电机局部恢复配电馈线上的关键负荷。但由于dg的惯性小,容量小,在进行开关操作时可能会产生较大的干扰,可能导致恢复失败。此外,不同类型dg的动态特性不同,在实施恢复策略时需要考虑。本文提出了一种两步恢复方法来确定切换操作的顺序,包括dg的启动、线路切换操作和负载提取,以减轻切换操作引起的暂态。首先,将问题表述为一个松弛的混合整数二阶二次规划,确定了修复后系统的工作点。然后,提出一种恢复规则来确定到达工作点的切换操作顺序。利用熵权法,结合各DG的动态特性,确定DG的启动顺序。一个32总线测试馈线与几种类型的dg被用来证明所提出的方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Service Restoration Using Different Types of DGs Considering Dynamic Characteristics
After major outages of distribution system, critical loads on distribution feeders can be locally restored by multiple types of distributed generators (DGs) before the utility power is available. However, due to the low inertia and small capacity of DGs, it may cause large disturbances when conducting switching operations, which may cause failure of restoration. In addition, dynamic characteristics of different types of DGs are different and should be considered in implementation of restoration strategies. This paper proposes a two-step restoration method to determine the sequence of switching operations, including startup of DGs, line switching operations and load pick-up, to mitigate transients caused by the switching operations. First, the operating point of the post-restoration system is identified by formulating the problem as a relaxed mixed-integer second-order conic program. Then, a restoration rule is proposed to determine the sequence of switching operations to reach the operating point. The entropy weight method is used to find the sequence of the startup of DGs considering the dynamic features of each DG. A 32-bus test feeder with several types of DGs is utilized to demonstrate the effectiveness of the proposed method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信