{"title":"PT.阿基韦奥集团预算成本项目培训应用程序","authors":"Juna Eska, Hidayatullah Hidayatullah, Afni Nia Sari","doi":"10.54314/jpstm.v3i1.1270","DOIUrl":null,"url":null,"abstract":"Abstarct : Budgeting Plan (RAB) is one of the main processes in a construction project because it is the basis for making an offer of a financing system and a schedule for construction implementation. Currently RAB is mostly done by using Microsoft Excel to simplify the calculation process. In the implementation of construction projects, calculating the weight is very important to estimate the expenditure of funds based on the existing budget plan (RAB). The method used in this community service is the Preparation Stage, socialization of activities, practice of making project cost budgets, and the evaluation stage. The purpose of this report is to show an application model that can be used to facilitate the calculation of a budget plan made based on the Indonesian National Standard Cost Analysis (SNI). This application is made with Visual Basic 6.0 Programming Language and MySQL database. Keywords: cost budget plan; cost analysis; SNI.  Abstrak : Rencana Anggaran Biaya (RAB) merupakan salah satu proses utama dalam proyek konstruksi karena merupakan dasar untuk membuat penawaran sistem pembiayaan dan jadwal pelaksanaan konstruksi. Saat ini RAB banyak dilakukan dengan cara menggunakan Microsoft Excel untuk mempermudah  proses perhitungan. Dalam  pelaksanaan proyek konstruksi perhitungan bobot sangat penting untuk memperkirakan pengeluaran dana berdasarkan rencana anggaran biaya (RAB) yang ada. Adapun Metode yang dilakukan dalam pengabdian masyarakat ini adalah Tahap Persiapan , sosialisasi kegiatan, praktek membuat anggaran biaya proyek, dan tahap evaluasi. Tujuan dari laporan ini adalah untuk menunjukan suatu model  aplikasi yang dapat digunakan untuk mempermudah perhitungan rencana anggaran biaya yang dibuat berdasarkan analisa biaya standar nasional indonesia (SNI). Aplikasi ini dibuat dengan Bahasa Pemrograman Visual Basic 6.0 dan database MySQL. Kata Kunci : rencana anggaran biaya; analisa biaya; SNI.","PeriodicalId":201854,"journal":{"name":"Jurnal Pemberdayaan Sosial dan Teknologi Masyarakat","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Pelatihan Aplikasi Rencana Anggaran Biaya Proyek Pada PT.Archivelo Group\",\"authors\":\"Juna Eska, Hidayatullah Hidayatullah, Afni Nia Sari\",\"doi\":\"10.54314/jpstm.v3i1.1270\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstarct : Budgeting Plan (RAB) is one of the main processes in a construction project because it is the basis for making an offer of a financing system and a schedule for construction implementation. Currently RAB is mostly done by using Microsoft Excel to simplify the calculation process. In the implementation of construction projects, calculating the weight is very important to estimate the expenditure of funds based on the existing budget plan (RAB). The method used in this community service is the Preparation Stage, socialization of activities, practice of making project cost budgets, and the evaluation stage. The purpose of this report is to show an application model that can be used to facilitate the calculation of a budget plan made based on the Indonesian National Standard Cost Analysis (SNI). This application is made with Visual Basic 6.0 Programming Language and MySQL database. Keywords: cost budget plan; cost analysis; SNI.  Abstrak : Rencana Anggaran Biaya (RAB) merupakan salah satu proses utama dalam proyek konstruksi karena merupakan dasar untuk membuat penawaran sistem pembiayaan dan jadwal pelaksanaan konstruksi. Saat ini RAB banyak dilakukan dengan cara menggunakan Microsoft Excel untuk mempermudah  proses perhitungan. Dalam  pelaksanaan proyek konstruksi perhitungan bobot sangat penting untuk memperkirakan pengeluaran dana berdasarkan rencana anggaran biaya (RAB) yang ada. Adapun Metode yang dilakukan dalam pengabdian masyarakat ini adalah Tahap Persiapan , sosialisasi kegiatan, praktek membuat anggaran biaya proyek, dan tahap evaluasi. Tujuan dari laporan ini adalah untuk menunjukan suatu model  aplikasi yang dapat digunakan untuk mempermudah perhitungan rencana anggaran biaya yang dibuat berdasarkan analisa biaya standar nasional indonesia (SNI). Aplikasi ini dibuat dengan Bahasa Pemrograman Visual Basic 6.0 dan database MySQL. Kata Kunci : rencana anggaran biaya; analisa biaya; SNI.\",\"PeriodicalId\":201854,\"journal\":{\"name\":\"Jurnal Pemberdayaan Sosial dan Teknologi Masyarakat\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Pemberdayaan Sosial dan Teknologi Masyarakat\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54314/jpstm.v3i1.1270\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Pemberdayaan Sosial dan Teknologi Masyarakat","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54314/jpstm.v3i1.1270","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要:预算计划(RAB)是建设项目的主要流程之一,它是提出融资方案和制定建设实施计划的依据。目前RAB主要是使用Microsoft Excel来简化计算过程。在建设项目实施中,根据现有预算计划(RAB)估算资金支出,权重的计算是非常重要的。该社区服务采用的方法是准备阶段、活动社会化阶段、项目成本预算实践阶段和评估阶段。本报告的目的是展示一个应用程序模型,该模型可用于促进基于印度尼西亚国家标准成本分析(SNI)制定的预算计划的计算。本应用程序是用Visual Basic 6.0编程语言和MySQL数据库编写的。关键词:成本预算方案;成本分析;SNI。摘要/ abstract摘要:Rencana Anggaran Biaya (RAB) merupakan salah satu proses utama dalam proyek konstruksi karena merupakan dasar untuk成员penawaran系统pembiayaan和jadwal pelaksanaan konstruksi。Saat ini RAB banyak dilakukan dengan cara menggunakan Microsoft Excel untuk成员处理perhitungan。中国人民民主主义人民共和国人民民主主义人民共和国人民民主主义人民共和国人民民主主义人民共和国人民民主主义人民共和国人民民主主义人民共和国人民民主主义人民共和国人民民主主义人民共和国人民民主主义人民共和国人民民主主义人民共和国人民民主主义人民共和国。apadapun Metode yang dilakukan dalam pengabdian masyarakat ini adalah Tahap peran, social alisasi kegiatan, praktek成员anggaran biaya proyek, dan Tahap evaluasi。图juan dari laporan ini adalah untuk menunjukan suatu模型应用于kasi yang dapat digunakan untuk成员permudah perhitungan rencanan anggaran biaya yang dibuat berdasarkan analisa biaya standard national indonesia (SNI)。application . ini发布了dengan Bahasa . exe, Visual Basic 6.0,数据库MySQL。Kata Kunci: rencana anggaran biaya;analisa biaya;SNI。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Pelatihan Aplikasi Rencana Anggaran Biaya Proyek Pada PT.Archivelo Group
Abstarct : Budgeting Plan (RAB) is one of the main processes in a construction project because it is the basis for making an offer of a financing system and a schedule for construction implementation. Currently RAB is mostly done by using Microsoft Excel to simplify the calculation process. In the implementation of construction projects, calculating the weight is very important to estimate the expenditure of funds based on the existing budget plan (RAB). The method used in this community service is the Preparation Stage, socialization of activities, practice of making project cost budgets, and the evaluation stage. The purpose of this report is to show an application model that can be used to facilitate the calculation of a budget plan made based on the Indonesian National Standard Cost Analysis (SNI). This application is made with Visual Basic 6.0 Programming Language and MySQL database. Keywords: cost budget plan; cost analysis; SNI.  Abstrak : Rencana Anggaran Biaya (RAB) merupakan salah satu proses utama dalam proyek konstruksi karena merupakan dasar untuk membuat penawaran sistem pembiayaan dan jadwal pelaksanaan konstruksi. Saat ini RAB banyak dilakukan dengan cara menggunakan Microsoft Excel untuk mempermudah  proses perhitungan. Dalam  pelaksanaan proyek konstruksi perhitungan bobot sangat penting untuk memperkirakan pengeluaran dana berdasarkan rencana anggaran biaya (RAB) yang ada. Adapun Metode yang dilakukan dalam pengabdian masyarakat ini adalah Tahap Persiapan , sosialisasi kegiatan, praktek membuat anggaran biaya proyek, dan tahap evaluasi. Tujuan dari laporan ini adalah untuk menunjukan suatu model  aplikasi yang dapat digunakan untuk mempermudah perhitungan rencana anggaran biaya yang dibuat berdasarkan analisa biaya standar nasional indonesia (SNI). Aplikasi ini dibuat dengan Bahasa Pemrograman Visual Basic 6.0 dan database MySQL. Kata Kunci : rencana anggaran biaya; analisa biaya; SNI.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信