{"title":"介绍为将安装在乌拉圭电力系统中的新RAS开发的模拟器","authors":"S. Beledo, N. Yedrzejewski","doi":"10.1109/ISGT-LA.2015.7381152","DOIUrl":null,"url":null,"abstract":"In electric power systems there are contingencies that can cause overload of any equipment, angular and voltage stability problems and frequency stability issues due to imbalances between load and generation. Most of those contingencies require disconnecting load to ensure the stability of the system and the integrity of the equipment. In most cases disconnection should be performed so quickly that it is possible only automatically. Such solutions are commonly referred by the acronym RAS, which means “Remedial Action Scheme”. UTE is currently implementing a solution of RAS [1] type to protect the network against the most severe contingencies.","PeriodicalId":345318,"journal":{"name":"2015 IEEE PES Innovative Smart Grid Technologies Latin America (ISGT LATAM)","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Description of the simulator developed for the new RAS to be installed in the power system of Uruguay\",\"authors\":\"S. Beledo, N. Yedrzejewski\",\"doi\":\"10.1109/ISGT-LA.2015.7381152\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In electric power systems there are contingencies that can cause overload of any equipment, angular and voltage stability problems and frequency stability issues due to imbalances between load and generation. Most of those contingencies require disconnecting load to ensure the stability of the system and the integrity of the equipment. In most cases disconnection should be performed so quickly that it is possible only automatically. Such solutions are commonly referred by the acronym RAS, which means “Remedial Action Scheme”. UTE is currently implementing a solution of RAS [1] type to protect the network against the most severe contingencies.\",\"PeriodicalId\":345318,\"journal\":{\"name\":\"2015 IEEE PES Innovative Smart Grid Technologies Latin America (ISGT LATAM)\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IEEE PES Innovative Smart Grid Technologies Latin America (ISGT LATAM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGT-LA.2015.7381152\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE PES Innovative Smart Grid Technologies Latin America (ISGT LATAM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGT-LA.2015.7381152","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在电力系统中,由于负载和发电之间的不平衡,可能会导致任何设备过载,角和电压稳定性问题以及频率稳定性问题。这些突发事件大多需要断开负载,以确保系统的稳定性和设备的完整性。在大多数情况下,断开连接应该执行得如此之快,以至于只能自动断开。这些解决方案通常被简称为RAS,意思是“补救行动计划”。UTE目前正在实施RAS[1]类型的解决方案,以保护网络免受最严重的突发事件的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Description of the simulator developed for the new RAS to be installed in the power system of Uruguay
In electric power systems there are contingencies that can cause overload of any equipment, angular and voltage stability problems and frequency stability issues due to imbalances between load and generation. Most of those contingencies require disconnecting load to ensure the stability of the system and the integrity of the equipment. In most cases disconnection should be performed so quickly that it is possible only automatically. Such solutions are commonly referred by the acronym RAS, which means “Remedial Action Scheme”. UTE is currently implementing a solution of RAS [1] type to protect the network against the most severe contingencies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信