{"title":"Examination of the Air Conditioning System of Toyota Avanza Car at CV. Cipta Artha Berlian Pasuruan","authors":"Indra Bhekti Utomo","doi":"10.21070/pels.v7i0.1524","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1524","url":null,"abstract":"The air conditioning (AC) system in a vehicle is a crucial component, especially in cars. Its primary task is to ensure the comfort of the driver and passengers. This system requires monitoring and maintenance for long-term use. This also applies to the AC system in Avanza/Xenia vehicles. Maintenance and repairs are ways to address issues that may weaken or damage your vehicle's AC system. Of course, maintenance and repair procedures should be carried out in accordance with proper troubleshooting rules. Troubleshooting involves a process known as diagnosis, which is the step to identify signs of damage and schedule investigations to resolve existing problems. Inspections involve using measuring tools such as a compressor and a multimeter on the magnetic clutch and evaporator to check the main components of the AC system. This is done to determine whether these components are operating properly according to service and maintenance standards for vehicle AC systems. Upon identification, corrective actions can be taken. The results show that the resistance value of the magnetic clutch coil is 3.9 ohms, and the magnetic clutch gap is 0.5 mm. The blower system resistance with three speed variations is 2.6 ohms at the low position, 0.7 ohms at the middle position, and 0 ohms at the high position. The blower motor resistance is 4 ohms. The measured values fall within the service limits or normal range as per the Avanza/Xenia manual. Therefore, it can be concluded that there are no issues with the AC system in the Avanza/Xenia vehicle, and the condition of the AC system is normal and suitable for use. No repair procedures are required, only routine maintenance is performed to ensure all components are in good condition. \u0000Highlights: \u0000 \u0000Routine maintenance prolongs AC system lifespan. \u0000Accurate diagnosis prevents potential issues. \u0000Component inspection ensures system health. \u0000 \u0000Keywords: PMCB, Vehicle Air Conditioning System, Maintenance, Repair, Troubleshooting","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"20 10","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140240788","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Testing of The Insulation Resistance and Turns Test Ratio (TTR) of The Distribution Transformers at PT PLN (Pesero) UP3 Sidoarjo","authors":"Muhammad Shofiyuddin, A. Wisaksono","doi":"10.21070/pels.v7i0.1478","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1478","url":null,"abstract":"Electricity plays a vital role in human life and the economic growth of Indonesia. Therefore, a reliable electrical transmission and distribution system is essential. Transformers, especially in an industrial context, play a key role in power supply. Transformer maintenance is a critical step in maintaining a stable flow of electricity. This study adopts the Research and Development (R&D) method and focuses on measuring insulation resistance and voltage ratios in the context of transformer maintenance. The research was conducted at the Pole Transformer Substation (GTT) in P. Melati, Sidoarjo Regency, East Java, starting in August 2023. The research variables involve measuring the insulation resistance referring to IEC standards and measuring the voltage ratio to ensure proper transformer performance. The test results indicate that the insulation resistance in the transformer, both on the primary and secondary sides, meets the standards, demonstrating that the transformer functions well and safely. Voltage ratio measurements closely approximate theoretical calculations and fall within a tolerance of ± 0.5%. This study underscores the importance of transformer maintenance in maintaining a stable flow of electricity. Proper maintenance will prevent disruptions that can be detrimental, such as current leakage or short circuits. With good maintenance, the continuity of a reliable and safe electricity distribution service for consumers can be ensured. ","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"22 7‐8","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140244193","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Analysis of Potential Risks Food Safety and Halal Standards in Food Industry (Case Study of Wafer Production Process)","authors":"Nurria Peppi Yuwana, Hana Catur Wahyuni","doi":"10.21070/pels.v7i0.1496","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1496","url":null,"abstract":"One of the factors that determines the competitiveness of a food product is the quality assurance of food safety and halal. Consuming unsafe food can endanger the health and lives of consumers. Until now, the distribution of unsafe and non-halal food is still a problem for Indonesia. This research aims to determine the implementation of food safety and halal systems in companies. This research was carried out by conducting interviews with employees. Alternative strategies and risk controls are selected based on 5W + 1H. The research results show that the efforts made by the company to improve food safety and halal in the wafer manufacturing process are the implementation of the HACCP system and the Halal Product Guarantee System. The results of observations on the implementation of HACCP show that companies must always monitor the operation of the HACCP system in the production area to improve food quality and safety.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"22 6","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140242845","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Raw Material Control Production of Crumble Type Chicken Animal Feed at PT Japfa Comfeed Indonesia, Tbk.","authors":"Erie Fadma Noer Fitriana Wijatmiko, T. Sukmono","doi":"10.21070/pels.v7i0.1492","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1492","url":null,"abstract":". Raw materials are tangible items used in production which can be obtained from natural sources or \u0000purchased from suppliers or companies that produce raw materials for the industry that uses them. MRP (Material Requirement Planning) According to Haizer and Render (2005: 160) the material requirement planning method is a bound demand technique that uses materials, inventory, estimated receipts, and master production schedules to determine the amount of material. Inventory control is a very important managerial function for the Company, material requirements planning is a planning system that focuses on the amount and time of finished goods requested \u0000which then determines the derivative demand for raw materials. From inventory control, it can be seen from the MRP \u0000calculation how much raw material PPIC must order, so that there is no shortage of raw materials or no inventory at all.And the results of MRP for one year or 12 periods can be known how much raw material must be provided for production in a year that will be data.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"2 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140243452","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Website of the Health Office of PPKB (Population Control, and Family Planning) of Mojokerto City","authors":"Mochammad Daffa Khasifi Nashrullah, S. Suprianto","doi":"10.21070/pels.v7i0.1503","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1503","url":null,"abstract":"The use of information technology has become mandatory in the current digital era, followed by the increasingly widespread development of the internet, which has further strengthened the importance of a web- based system. In designing a website-based system, the Department of Health, Population Control and Family Planning creates a Health Information System, PPKB Program, or Population Statistics. With this system, it explains the importance of the PPKB Health Strategy, in information related to population in an interesting and easy to understand way, detailed information regarding available health services, the PPKB (Population Control and Family Planning) program, population policies, and the latest initiatives. Tools or Interactives that help users in planning a family or understanding population statistics. Responsive design that ensures the website can be accessed well on various devices, including mobile phones and tablets, and ensures accessibility for users with special needs such as health services, information, or adequate accessibility features such as clear actions for visitors to engage further, or such as register for the PPKB program, look for further health information or can join relevant events or campaigns. Integrate social media, video streaming or other latest technology to improve user order and distribute information more effectively. This website must be a valuable and reliable source of information for the residents of the city of Mojokerto, providing needed support in health, PPKB programs, and understanding population issues. The success of this website depends on its ease of use, relevance of content, and its ability to encourage positive actions from visitors.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"1 4","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140241344","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Agus Setyawan Setyawan, Indah Apriliana Sari Wulandari
{"title":"Steel Production Process in CV. Tiga Putra Jaya Sejahtra","authors":"Agus Setyawan Setyawan, Indah Apriliana Sari Wulandari","doi":"10.21070/pels.v7i0.1481","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1481","url":null,"abstract":"The construction services business is an activity in the economic, social and cultural fields which has an important role in achieving various targets to support the realization of national development goals. CV. Tiga Putra Jaya Sejahtra is a company engaged in the steel construction industry which provides the manufacture of fences, trellises, balconies, canopies, stair railings, rolling doors, children's toys, folding doors, light steel, galvalume, water towers, iron roofs. The purpose of this The implementation of this activity is to observe the production process of making hollow fences and the result of this activity is to find out how long it takes to make hollow fences, the costs that will be needed and the preparation of the BOM for hollow fences.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"11 17","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140244445","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Extruder Component Repair on Extrusion Machine","authors":"Wiky Anjaya Arwiyono, P. H. Tjahjanti","doi":"10.21070/pels.v7i0.1486","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1486","url":null,"abstract":"Practical work is a form of educational and vocational organization that is participated in by students so that students can work directly in the world of business, industry or fabrication. Practical work aims to prepare students to become productive people and be able to work directly in their respective fields. Students can also experience the production atmosphere experienced by professional engineering in a factory. This research process requires several materials and equipment as equipment in the design process as well as several methods. data collection and problem formulation in the form of morphological design. The method for repairing the screw extruder is re-poking the screw thread area which was proposed by the customer technician who said that the screw thread area was starting to wear out so it needed to be rejuvenated. Maintenance Preventive Maintenance. Re-priming or rejuvenating the threaded part because the threaded part has started to wear out. For example, in scheduling, for screw components until now there has been no regular maintenance or replacement to overcome damage. After the time of re-positioning the screw enters the turning stage to smooth the surface before the unevenness of the re-positioning or CV. Sumber Agung Widodo is a company that has complete manufacturing equipment that can produce various kinds of spare parts from various kinds of production machines. Various problems that often occur have an impact on the ongoing production process. Some of the causes include not only material factors, but human resource factors also influence production quality.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"21 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140242657","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Polar Machine Maintenance","authors":"Surya Mahendra, Akhmad Ahfas","doi":"10.21070/pels.v7i0.1498","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1498","url":null,"abstract":"Polar Mohr machines are a well-known brand in the printing industry known for its quality paper cutting machines and printing materials. The method used is descriptive research method focused on the problem. The discussion of the polar mohr machine is starting from the position button, length button, reverse button, forward button, reset button and start button. The results of the mohr polar machine are from the polar machine planning to PLC assembly and installation. The conclusion of the polar machine is very helpful for smooth running in the industrial world because it simplifies the process of cutting paper. One of the characteristics of the Polar Mohr machine is its ability to make the cuts we want.Keywords – polar mohr; paper machine panels; panel wiring","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"48 4","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140242987","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Sub Distribution Panel’s Design Rancangan SubDistribution Panel","authors":"Dikas Pandu Nanggala, Akhmad Ahfas","doi":"10.21070/pels.v7i0.1484","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1484","url":null,"abstract":"Electrical panels play an important role as the center of electrical energy distribution, functioning to regulate the flow of electricity in a building. This distribution process requires something that can secure and divide the amount of power flowing, therefore the SDP (Sub Distribution Panel) panel is needed. This panel contains several components that are assembled into one unit so that it can function properly. This research uses a qualitative descriptive method that focuses on problems based on facts carried out by means of observation or observation, interviews, and studying documents. If all the techniques in this method are performed successfully, the accurate percentage of this research is 98%. This research produces a description of the process of making SDP panels from start to finish. This research resulted that the SDP panel has several functions, namely collecting and forwarding power to each load in each branch as needed, connecting and disconnecting the power distribution circuit and the safety of the power distribution system control.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"10 4","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140244641","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Implementation of the AHP Method in Determining the Completion of Logistics Warehouse Stock Buildup Using the Expert Choice Application","authors":"Sofie Amalia Afifah, A. S. Cahyana","doi":"10.21070/pels.v7i0.1497","DOIUrl":"https://doi.org/10.21070/pels.v7i0.1497","url":null,"abstract":"The development of logistics services that are increasing has caused an increase in customers of PT. Astrans Putra Logistik also increased, this resulted in the logistics warehouse capacity experiencing a buildup of goods that almost filled the warehouse capacity which made operational activities disrupted, and many complaints from customers. Resolution to overcome this warehouse problem needs to be done so that the company’s operational efficiency is not disrupted and warehouse stock capacity becomes better. This study aims to find out the best solution of warehouse problems that occur through a decision making support system design using the AHP method assisted by the use of the Expert Choice 11 application. In making this decision, 4 stages are carried out, namely Intelligence, Design, Choice, and Analysis of Assessment Result which in the process have a 4 kinds of criteria and 4 kinds of alternative solutions. From the calculation of the AHP method assisted by the use of the Expert Choice 11 application, the weight of each criterion was obtained, namely Increased Operational Efficiency getting a weight of 0,259, Number of Items that can be Accommodated getting a weight of 0,086, Company Income getting a weight of 0,495, and Company Expense getting a weight of 0,160. From the calculation of alternative settlements, it was also found that The Addition of a New Departure Fleet got a weight of 0,385, The Construction of Branch Goods Warehouse got a weight of 0,279, Upgrading Small Trucks to Large Trucks got a weight of 0,187, and The Application of a Pre-order system for customers got a weight of 0,149.","PeriodicalId":491073,"journal":{"name":"Procedia of Engineering and Life Science","volume":"85 8","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140241620","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}