Case study and survey on time and cost overrun of multiple D&B projects

N. S. Potty, Arazi B. Irdus, C. Ramanathan
{"title":"Case study and survey on time and cost overrun of multiple D&B projects","authors":"N. S. Potty, Arazi B. Irdus, C. Ramanathan","doi":"10.1109/NATPC.2011.6136364","DOIUrl":null,"url":null,"abstract":"Current trend of Design and Build (D&B) has gained popularity in the construction Industry due to its attractive financial aspects. The development projects are implemented by D&B for its special nature, crucial time and size. Many of this D&B projects had ended in the hands of contractors unable to proceed the projects within agreed time and price. Even some of those completed projects were committed to begin implementation without carrying any analyze of risks involved. They are basically committed by judgement and inadequate experience. The risk of time and cost overrun is more while committing to multiple simultaneous projects. Even though there were studies conducted for Risk management of projects and studies on contractors' view of D&B projects, so far there are no studies conducted on time and cost risks of D&B projects. In addition to study further for multiple projects. The aim of this study is to identify elements and procedures to analyse and overcome the risks of the important components of time and cost in management of multiple D&B bridge projects. The research has dual approach by conducting questionnaire survey and multiple case studies for the analysis and findings. This will encourage the industrial practitioners to prepare a practical risk response plan to complete the projects successfully.","PeriodicalId":6411,"journal":{"name":"2011 National Postgraduate Conference","volume":"40 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2011-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 National Postgraduate Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NATPC.2011.6136364","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14

Abstract

Current trend of Design and Build (D&B) has gained popularity in the construction Industry due to its attractive financial aspects. The development projects are implemented by D&B for its special nature, crucial time and size. Many of this D&B projects had ended in the hands of contractors unable to proceed the projects within agreed time and price. Even some of those completed projects were committed to begin implementation without carrying any analyze of risks involved. They are basically committed by judgement and inadequate experience. The risk of time and cost overrun is more while committing to multiple simultaneous projects. Even though there were studies conducted for Risk management of projects and studies on contractors' view of D&B projects, so far there are no studies conducted on time and cost risks of D&B projects. In addition to study further for multiple projects. The aim of this study is to identify elements and procedures to analyse and overcome the risks of the important components of time and cost in management of multiple D&B bridge projects. The research has dual approach by conducting questionnaire survey and multiple case studies for the analysis and findings. This will encourage the industrial practitioners to prepare a practical risk response plan to complete the projects successfully.
对多个D&B项目的时间和成本超支进行案例分析和调查
当前的设计与建造(D&B)趋势由于其具有吸引力的财务方面而在建筑行业中受到欢迎。由于开发项目的特殊性质、关键时间和规模,德邦银行实施了开发项目。许多D&B项目都在承包商手中结束,无法在商定的时间和价格内进行项目。甚至在一些已完成的项目中,没有对所涉及的风险进行任何分析就承诺开始实施。他们基本上是由于判断和经验不足而犯的罪。在同时进行多个项目时,时间和成本超支的风险更大。虽然有关于项目风险管理的研究,也有关于承包商对D&B项目看法的研究,但目前还没有关于D&B项目的时间和成本风险的研究。此外还要为多个项目进一步学习。本研究的目的是确定要素和程序,以分析和克服多个D&B桥梁项目管理中时间和成本的重要组成部分的风险。本研究采用问卷调查和多案例研究相结合的方法进行分析和研究。这将鼓励行业从业者准备一个实际的风险应对计划,以成功完成项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信