{"title":"A Case Study of Obtaining Total Generation Costs using DC-Optimal Power Flow","authors":"A. Ova, Şevki Demіrbaş","doi":"10.1109/SGRE53517.2022.9774236","DOIUrl":null,"url":null,"abstract":"In general, Generation Planning studies constitute the first step of Transmission Expansion Planning (TEP) studies. Optimal Power Flow studies are also important in Generation Planning studies. Since it gives effective and efficient results, Optimal Power Flow (DC-OPF) which is a linearized formation of AC power flow with some assumptions is widely used. In this study, the DC-OPF problem is modeled as a linear problem and technical and economic results regarding generation planning are obtained. Garver-6 Bus test system is used as the test system. As a result of the optimization, the total generation value, the total generation cost, and the generation and cost values for each power plant are obtained.","PeriodicalId":64562,"journal":{"name":"智能电网与可再生能源(英文)","volume":"12 1","pages":"1-4"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"智能电网与可再生能源(英文)","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1109/SGRE53517.2022.9774236","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In general, Generation Planning studies constitute the first step of Transmission Expansion Planning (TEP) studies. Optimal Power Flow studies are also important in Generation Planning studies. Since it gives effective and efficient results, Optimal Power Flow (DC-OPF) which is a linearized formation of AC power flow with some assumptions is widely used. In this study, the DC-OPF problem is modeled as a linear problem and technical and economic results regarding generation planning are obtained. Garver-6 Bus test system is used as the test system. As a result of the optimization, the total generation value, the total generation cost, and the generation and cost values for each power plant are obtained.