{"title":"Analysis of Downtime Problems on Elevator Machine at PT. Santosa Utama Lestari using Tree Diagrams","authors":"Ismi Mashabai, Andi Mustika Irahayu Asran","doi":"10.32764/saintekbu.v15i01.3258","DOIUrl":null,"url":null,"abstract":"Downtime is a condition in which the machine stops operating not on scheduled stops but due to a disturbance that occurs on the machine, so the machine will be idle until the machine has been repaired or is not in a state of disturbance. Downtime is when production equipment is not functioning due to a sudden inspection and repair of damaged equipment. Elevators can raise the material to a height of up to 50 meters; the capacity can reach 50 ????3/hour. The construction can reach a vertical position. The working principle of this tool is to move the material vertically by placing the material in buckets which are linked by a chain or belt at a certain distance which rotates on the pulley so that the bouquet can move vertically. This study uses the tree diagram method to analyse downtime problems by applying the 5 M + 1E technique.","PeriodicalId":21494,"journal":{"name":"SAINTEKBU","volume":"16 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SAINTEKBU","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32764/saintekbu.v15i01.3258","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Downtime is a condition in which the machine stops operating not on scheduled stops but due to a disturbance that occurs on the machine, so the machine will be idle until the machine has been repaired or is not in a state of disturbance. Downtime is when production equipment is not functioning due to a sudden inspection and repair of damaged equipment. Elevators can raise the material to a height of up to 50 meters; the capacity can reach 50 ????3/hour. The construction can reach a vertical position. The working principle of this tool is to move the material vertically by placing the material in buckets which are linked by a chain or belt at a certain distance which rotates on the pulley so that the bouquet can move vertically. This study uses the tree diagram method to analyse downtime problems by applying the 5 M + 1E technique.