Effective assignment of work items for an engineering consulting project based on consulting engineer selection matrix

IF 1 4区 工程技术 Q3 ENGINEERING, MULTIDISCIPLINARY
Shih-Hsu Wang
{"title":"Effective assignment of work items for an engineering consulting project based on consulting engineer selection matrix","authors":"Shih-Hsu Wang","doi":"10.1080/02533839.2023.2170925","DOIUrl":null,"url":null,"abstract":"ABSTRACT To reasonably utilize human resources, engineering consulting firms should establish effective task assignment mechanisms. In this study, the consulting engineer selection matrix (CESM) was proposed to select engineers for a work item of an engineering consulting project on the basis of contract amount reasonableness, work item importance, engineer hourly rate, and engineer experience. The matrix identified the available engineers in an engineering consulting firm who possessed the operating experience to execute a specific work item. The matrix also divided the engineers into four quadrants depending on contract amount reasonableness and work item importance. A project manager then selected the engineers of a work item depending on their hourly rate (high or low) and experience (experienced or inexperienced) and depending on four task assignment strategies, which entailed the lowest cost, maximum engineer experience, optimal cost efficiency, and imparting experience. The results confirmed that the CESM reduced the salary expenditure of projects without reducing the competence requirements of team members or the investment of human resources. It also allowed project managers to select suitable engineers as project team members instead of passively waiting for functional departments to allocate engineers.","PeriodicalId":17313,"journal":{"name":"Journal of the Chinese Institute of Engineers","volume":"18 1","pages":"229 - 241"},"PeriodicalIF":1.0000,"publicationDate":"2023-02-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Chinese Institute of Engineers","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1080/02533839.2023.2170925","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

ABSTRACT To reasonably utilize human resources, engineering consulting firms should establish effective task assignment mechanisms. In this study, the consulting engineer selection matrix (CESM) was proposed to select engineers for a work item of an engineering consulting project on the basis of contract amount reasonableness, work item importance, engineer hourly rate, and engineer experience. The matrix identified the available engineers in an engineering consulting firm who possessed the operating experience to execute a specific work item. The matrix also divided the engineers into four quadrants depending on contract amount reasonableness and work item importance. A project manager then selected the engineers of a work item depending on their hourly rate (high or low) and experience (experienced or inexperienced) and depending on four task assignment strategies, which entailed the lowest cost, maximum engineer experience, optimal cost efficiency, and imparting experience. The results confirmed that the CESM reduced the salary expenditure of projects without reducing the competence requirements of team members or the investment of human resources. It also allowed project managers to select suitable engineers as project team members instead of passively waiting for functional departments to allocate engineers.
基于咨询工程师选择矩阵的工程咨询项目工作项的有效分配
工程咨询公司要合理利用人力资源,就必须建立有效的任务分配机制。在本研究中,提出了咨询工程师选择矩阵(CESM),根据合同额合理性、工作项目重要性、工程师时薪和工程师经验来选择工程咨询项目中某一工作项目的工程师。矩阵确定了工程咨询公司中具有执行特定工作项目的操作经验的可用工程师。该矩阵还根据合同金额的合理性和工作项目的重要性将工程师分为四个象限。然后,项目经理根据每小时的费率(高或低)和经验(有经验或没有经验)以及四种任务分配策略来选择工作项的工程师,这些策略包括最低成本、最大工程师经验、最优成本效率和传授经验。结果证实,CESM在不降低团队成员能力要求或人力资源投资的情况下减少了项目的工资支出。它还允许项目经理选择合适的工程师作为项目团队成员,而不是被动地等待职能部门分配工程师。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of the Chinese Institute of Engineers
Journal of the Chinese Institute of Engineers 工程技术-工程:综合
CiteScore
2.30
自引率
9.10%
发文量
57
审稿时长
6.8 months
期刊介绍: Encompassing a wide range of engineering disciplines and industrial applications, JCIE includes the following topics: 1.Chemical engineering 2.Civil engineering 3.Computer engineering 4.Electrical engineering 5.Electronics 6.Mechanical engineering and fields related to the above.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信