{"title":"Ready-Set-Transfer: Technology transfer in the requirements engineering domain","authors":"J. Cleland-Huang, S. Ghaisas","doi":"10.1109/RE.2013.6636747","DOIUrl":null,"url":null,"abstract":"Requirements engineering research is undertaken to propose innovative solutions, to develop concepts, algorithms, processes, and technologies, to validate effective solutions for important requirements-related problems, and ultimately to support the transition of important findings to practice. However prior studies have shown that successful projects often take from 20-25 years to reach the stage of full industry adoption, while many other projects fizzle out and never advance beyond the initial research phase. This panel provides the opportunity for practitioners and academics to engage in a meaningful discussion around the topic of technology transfer. In this third offering of the Ready-Set-Transfer panel, three research groups will present products that they believe to be industry-ready to a panel of industrial practitioners. Each team will receive feedback from the panelists. The long-term goal of the panel is to increase technology transfer in the requirements engineering domain.","PeriodicalId":6342,"journal":{"name":"2013 21st IEEE International Requirements Engineering Conference (RE)","volume":"25 1","pages":"345-346"},"PeriodicalIF":0.0000,"publicationDate":"2013-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 21st IEEE International Requirements Engineering Conference (RE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RE.2013.6636747","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
Requirements engineering research is undertaken to propose innovative solutions, to develop concepts, algorithms, processes, and technologies, to validate effective solutions for important requirements-related problems, and ultimately to support the transition of important findings to practice. However prior studies have shown that successful projects often take from 20-25 years to reach the stage of full industry adoption, while many other projects fizzle out and never advance beyond the initial research phase. This panel provides the opportunity for practitioners and academics to engage in a meaningful discussion around the topic of technology transfer. In this third offering of the Ready-Set-Transfer panel, three research groups will present products that they believe to be industry-ready to a panel of industrial practitioners. Each team will receive feedback from the panelists. The long-term goal of the panel is to increase technology transfer in the requirements engineering domain.