Research on the process model of product development with uncertainty based on activity overlapping

R. Xiao, S. Si
{"title":"Research on the process model of product development with uncertainty based on activity overlapping","authors":"R. Xiao, S. Si","doi":"10.1108/09576060310491928","DOIUrl":null,"url":null,"abstract":"The essence of competition among modern enterprises is time; hence the time for product development must be greatly reduced. This paper presents a new process model of product development with uncertainty based on activity overlapping, borrowing ideas from the uncertainty model and activity overlapping model proposed by Loch and Terwiesch, and Krishnan respectively, to realize reduction on the time. Besides the fundamental framework of the proposed model, some derivations on the formula computing the total execution time of upstream and downstream activities are made. The effectiveness of the proposed model is verified through some further discussions and initial computational results.","PeriodicalId":100314,"journal":{"name":"Computer Integrated Manufacturing Systems","volume":"48 1","pages":"567-574"},"PeriodicalIF":0.0000,"publicationDate":"2003-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Computer Integrated Manufacturing Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/09576060310491928","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

Abstract

The essence of competition among modern enterprises is time; hence the time for product development must be greatly reduced. This paper presents a new process model of product development with uncertainty based on activity overlapping, borrowing ideas from the uncertainty model and activity overlapping model proposed by Loch and Terwiesch, and Krishnan respectively, to realize reduction on the time. Besides the fundamental framework of the proposed model, some derivations on the formula computing the total execution time of upstream and downstream activities are made. The effectiveness of the proposed model is verified through some further discussions and initial computational results.
基于活动重叠的不确定产品开发过程模型研究
现代企业竞争的本质是时间;因此,产品开发的时间必须大大缩短。本文借鉴Loch和Terwiesch以及Krishnan分别提出的不确定性模型和活动重叠模型的思想,提出了一种新的基于活动重叠的不确定性产品开发过程模型,以实现时间的缩减。除了提出的模型的基本框架外,还推导了计算上游和下游活动总执行时间的公式。通过进一步的讨论和初步的计算结果,验证了该模型的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信