D.S. Da Silva Leite
{"title":"Noisy-Champs station: Coordinating underground, design and engineering","authors":"D.S. Da Silva Leite","doi":"10.1201/9781003031703-8","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":69598,"journal":{"name":"地下工程与隧道","volume":"24 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-07-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"地下工程与隧道","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1201/9781003031703-8","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0