Duration Estimation, a New Approach in Critical Chain Scheduling

K. Rezaie, B. Manouchehrabadi, S. N. Shirkouhi
{"title":"Duration Estimation, a New Approach in Critical Chain Scheduling","authors":"K. Rezaie, B. Manouchehrabadi, S. N. Shirkouhi","doi":"10.1109/AMS.2009.67","DOIUrl":null,"url":null,"abstract":"Critical chain project management (CCPM) has been introduced in 1997 by Goldratt which was known for its theory, theory of constraint. Since then CCPM attracted a great attention both in academic world and execution communities. One of the most controversial points of the CCPM which is a subject of critics is the way it suggests for activity duration estimation. This paper proposes a new method for duration estimation of activities by measuring the amount of uncertainty embedded in each activity duration and then taking out of safety times associated with this uncertainty. The validity of the proposed method is tested by conducting a computer simulation on some test problems. Simulation analysis shows that the proposed method yields schedules which are more reliable than the schedules produced by original CCPM method of duration estimation.","PeriodicalId":6461,"journal":{"name":"2009 Third Asia International Conference on Modelling & Simulation","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Third Asia International Conference on Modelling & Simulation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AMS.2009.67","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16

Abstract

Critical chain project management (CCPM) has been introduced in 1997 by Goldratt which was known for its theory, theory of constraint. Since then CCPM attracted a great attention both in academic world and execution communities. One of the most controversial points of the CCPM which is a subject of critics is the way it suggests for activity duration estimation. This paper proposes a new method for duration estimation of activities by measuring the amount of uncertainty embedded in each activity duration and then taking out of safety times associated with this uncertainty. The validity of the proposed method is tested by conducting a computer simulation on some test problems. Simulation analysis shows that the proposed method yields schedules which are more reliable than the schedules produced by original CCPM method of duration estimation.
工期估计——关键链调度中的一种新方法
关键链项目管理(CCPM)是由Goldratt于1997年提出的,该理论以约束理论而闻名。从那时起,CCPM受到了学术界和执行界的广泛关注。CCPM最具争议的一点是它对活动持续时间估计的建议方式。本文提出了一种新的活动持续时间估计方法,该方法通过测量每个活动持续时间中嵌入的不确定性的数量,然后取出与该不确定性相关的安全时间。通过对一些测试问题的计算机仿真,验证了所提方法的有效性。仿真分析表明,该方法产生的调度调度比原来的CCPM工期估计方法产生的调度调度更加可靠。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信