Multi-Objective Flexible Job-Shop Scheduling Problem in Steel Tubes Production

Lin Li, Jia-zhen Huo
{"title":"Multi-Objective Flexible Job-Shop Scheduling Problem in Steel Tubes Production","authors":"Lin Li,&nbsp;Jia-zhen Huo","doi":"10.1016/S1874-8651(10)60063-4","DOIUrl":null,"url":null,"abstract":"<div><p>On the basis of the distinct characteristics of steel tube production process, the production scheduling problem of seamless steel tubes is described as flexible job-shop scheduling problem. Considering the parallel machines with capacity and speed constraint, maintenance of machines as well as intermediate inventory restriction, it is formulated as mixed-integer-programming(MIP) model to decide the flexible routes for every job and to optimize the sequence of jobs. The objective is not only to reduce delivery delay, but also to minimize idleness of machines and interruption in production. Given the problem is NP-hard (non-deterministic polynomial-time hard), modified genetic algorithm is proposed, whose effectiveness can be well verified in scheduling decision support system for the production of seamless steel tubes in Baoshan Iron &amp; Steel Complex.</p></div>","PeriodicalId":101206,"journal":{"name":"Systems Engineering - Theory & Practice","volume":"29 8","pages":"Pages 117-126"},"PeriodicalIF":0.0000,"publicationDate":"2009-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1874-8651(10)60063-4","citationCount":"41","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Systems Engineering - Theory & Practice","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1874865110600634","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 41

Abstract

On the basis of the distinct characteristics of steel tube production process, the production scheduling problem of seamless steel tubes is described as flexible job-shop scheduling problem. Considering the parallel machines with capacity and speed constraint, maintenance of machines as well as intermediate inventory restriction, it is formulated as mixed-integer-programming(MIP) model to decide the flexible routes for every job and to optimize the sequence of jobs. The objective is not only to reduce delivery delay, but also to minimize idleness of machines and interruption in production. Given the problem is NP-hard (non-deterministic polynomial-time hard), modified genetic algorithm is proposed, whose effectiveness can be well verified in scheduling decision support system for the production of seamless steel tubes in Baoshan Iron & Steel Complex.

钢管生产中的多目标柔性作业车间调度问题
根据钢管生产过程的特点,将无缝钢管的生产调度问题描述为柔性作业车间调度问题。考虑具有容量和速度约束、机器维护和中间库存限制的并联机床,将其表述为混合整数规划(MIP)模型,确定每个作业的柔性路线,并优化作业顺序。目标不仅是减少交货延迟,而且要尽量减少机器闲置和生产中断。针对宝钢无缝钢管生产调度决策支持系统的np困难(非确定性多项式时间困难)问题,提出了改进的遗传算法,该算法的有效性在宝钢无缝钢管生产调度决策支持系统中得到很好的验证。钢铁联合企业。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信