Build-Transfer-Operate with risk sharing approach for railway public-private-partnership project in Korea

Juyeon Lee, Kyungtaek Kim, Jaehak Oh
{"title":"Build-Transfer-Operate with risk sharing approach for railway public-private-partnership project in Korea","authors":"Juyeon Lee,&nbsp;Kyungtaek Kim,&nbsp;Jaehak Oh","doi":"10.1016/j.eastsj.2022.100061","DOIUrl":null,"url":null,"abstract":"<div><p>To attract the private sector to railway public-private partnership (PPP) projects, the public sector is required to share risks resulted from a failure in demand forecasting. The Korean government introduced BTO-risk sharing (BTO-rs) as a new PPP arrangement to promote investments in railway projects. BTO-rs is to share operating costs and revenues by both the public and private sectors. This study explains the methodology of BTO-rs. Based on BTO-rs, this study conducted the sensitivity analysis for the real railway project. The result of the sensitivity analysis suggests that sharing ratio of the excess operating profit and loss of the government and demand are the most influential factors affecting the concessionaire’s rate of return.</p></div>","PeriodicalId":100131,"journal":{"name":"Asian Transport Studies","volume":"8 ","pages":"Article 100061"},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2185556022000074/pdfft?md5=7bf2dd3651847e3e2a88c4f4ba0d7076&pid=1-s2.0-S2185556022000074-main.pdf","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asian Transport Studies","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2185556022000074","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

To attract the private sector to railway public-private partnership (PPP) projects, the public sector is required to share risks resulted from a failure in demand forecasting. The Korean government introduced BTO-risk sharing (BTO-rs) as a new PPP arrangement to promote investments in railway projects. BTO-rs is to share operating costs and revenues by both the public and private sectors. This study explains the methodology of BTO-rs. Based on BTO-rs, this study conducted the sensitivity analysis for the real railway project. The result of the sensitivity analysis suggests that sharing ratio of the excess operating profit and loss of the government and demand are the most influential factors affecting the concessionaire’s rate of return.

韩国铁路公私合作项目风险分担模式下的建设-转让-运营
为了吸引私营部门参与铁路公私合作(PPP)项目,公共部门需要分担需求预测失败带来的风险。韩国政府为了促进铁路事业投资,引进了新的PPP制度——bto风险分担制度(BTO-rs)。BTO-rs是由公共和私营部门共同分担运营成本和收入。本研究解释了BTO-rs的方法论。本研究基于BTO-rs对实际铁路工程进行了敏感性分析。敏感性分析结果表明,政府超额经营盈亏分担比例和需求是影响特许经营企业收益率的最主要因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
2.10
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信