Interlude: Two Kinds of Uncertainty

T. Yarrow
{"title":"Interlude: Two Kinds of Uncertainty","authors":"T. Yarrow","doi":"10.7591/cornell/9781501738494.003.0034","DOIUrl":null,"url":null,"abstract":"In the car back to the office, Tomas is feeling, as he often remarks, “stressed.” A lot has been going on in the practice. Over the last year there has been a process of expansion, with more and bigger projects than usual. New staff have been taken on. Systems have been changed, to try to make the process more efficient. Changes have been difficult to implement, alongside the usual pressures of building and design deadlines—“like changing the engine of a car while you’re still driving,” as he puts it....","PeriodicalId":79772,"journal":{"name":"AIA journal. American Institute of Architects","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"AIA journal. American Institute of Architects","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7591/cornell/9781501738494.003.0034","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In the car back to the office, Tomas is feeling, as he often remarks, “stressed.” A lot has been going on in the practice. Over the last year there has been a process of expansion, with more and bigger projects than usual. New staff have been taken on. Systems have been changed, to try to make the process more efficient. Changes have been difficult to implement, alongside the usual pressures of building and design deadlines—“like changing the engine of a car while you’re still driving,” as he puts it....
插曲:两种不确定性
在回办公室的车里,托马斯感到,正如他经常说的,“压力很大”。在实践中发生了很多事情。在过去的一年里,出现了一个扩张的过程,项目比以往更多、更大。新职员已被聘用。系统已经改变,试图使过程更有效率。变革很难实施,再加上通常的建设和设计截止日期的压力——“就像在你还在开车的时候给汽车换引擎,”他说....
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信