Probabilistic Approach for Identifying Longest Fuzzy Critical Path

Ranen Z.Ahmood, Fedaa N. Abdulahad
{"title":"Probabilistic Approach for Identifying Longest Fuzzy Critical Path","authors":"Ranen Z.Ahmood, Fedaa N. Abdulahad","doi":"10.22401/anjs.25.2.06","DOIUrl":null,"url":null,"abstract":"This paper, considers the occurring problem of fuzzy project network either in some or whole activities which areinterrupted. A probability density function is constructed from the activities of the membership of the fuzzy set. Then an approach is proposed for identifying the longest critical path, by determining in each activity thecriticality index depending on the costs yielded from project lateness caused by the interruption activities. A case study is presented and simulated to explain our approach.","PeriodicalId":7494,"journal":{"name":"Al-Nahrain Journal of Science","volume":"31 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Al-Nahrain Journal of Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22401/anjs.25.2.06","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper, considers the occurring problem of fuzzy project network either in some or whole activities which areinterrupted. A probability density function is constructed from the activities of the membership of the fuzzy set. Then an approach is proposed for identifying the longest critical path, by determining in each activity thecriticality index depending on the costs yielded from project lateness caused by the interruption activities. A case study is presented and simulated to explain our approach.
最长模糊关键路径识别的概率方法
本文考虑了模糊工程网络在部分或全部活动中断时出现的问题。从模糊集的隶属度活动构造了一个概率密度函数。然后提出了一种识别最长关键路径的方法,通过确定每个活动的关键指数,该指数取决于由中断活动引起的项目延迟所产生的成本。通过一个案例研究和模拟来解释我们的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信