Water Supply and Demand Status of Areka Town, Southern Ethiopia

Q3 Business, Management and Accounting
Wondimu Elias Worajo, Wolaita Sodo
{"title":"Water Supply and Demand Status of Areka Town, Southern Ethiopia","authors":"Wondimu Elias Worajo, Wolaita Sodo","doi":"10.7176/jrdm/77-02","DOIUrl":null,"url":null,"abstract":"Water is one of the vital necessity or the need for human being and for all living things. This study was conducted to assess the existing and to forecast the future water supply and demand status of the Areka town, southern Ethiopia. A total of 196 households (HHs) were randomly selected and interviewed by using a questionnaire. To collect the required data, interview and observation were used and written documents were reviewed. Data analyzed by SPSS and Excel spread sheet. The town population was growing rapidly, but water production was low, i.e. only 720m 3 /d. This covers only 51.9% of the total population. Additional water production of 26.49 l/s (2288.7m 3 /d) was required to fill the gap. Available per capita water demand, i.e. 11.48l/c/d was small as compared to WHO basic access standard, i.e. 20 l/c/d. The total revenue water and non-revenue water from the existing water production were 525.18m 3 /d and 194.81m 3 /d, respectively. About 48% of HHs got their primary water from existing water supply lines and the remaining 52% got their primary water from non-connected sources. In order to narrow the supply and demand gap, expansion of water supply services and additional water sources should be provided.","PeriodicalId":35409,"journal":{"name":"International Journal of Human Resources Development and Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Human Resources Development and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7176/jrdm/77-02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 0

Abstract

Water is one of the vital necessity or the need for human being and for all living things. This study was conducted to assess the existing and to forecast the future water supply and demand status of the Areka town, southern Ethiopia. A total of 196 households (HHs) were randomly selected and interviewed by using a questionnaire. To collect the required data, interview and observation were used and written documents were reviewed. Data analyzed by SPSS and Excel spread sheet. The town population was growing rapidly, but water production was low, i.e. only 720m 3 /d. This covers only 51.9% of the total population. Additional water production of 26.49 l/s (2288.7m 3 /d) was required to fill the gap. Available per capita water demand, i.e. 11.48l/c/d was small as compared to WHO basic access standard, i.e. 20 l/c/d. The total revenue water and non-revenue water from the existing water production were 525.18m 3 /d and 194.81m 3 /d, respectively. About 48% of HHs got their primary water from existing water supply lines and the remaining 52% got their primary water from non-connected sources. In order to narrow the supply and demand gap, expansion of water supply services and additional water sources should be provided.
埃塞俄比亚南部Areka镇的水供需状况
水是人类和所有生物的重要必需品之一。本研究旨在评估埃塞俄比亚南部Areka镇的现有供水和需求状况,并预测未来的供水和需求状况。随机抽取196户家庭进行问卷调查。为了收集所需的数据,采用了访谈和观察的方法,并对书面文件进行了审查。数据分析采用SPSS和Excel电子表格。城镇人口增长迅速,但产水量较低,仅为7.2亿立方米/天。这只覆盖了总人口的51.9%。为了填补缺口,需要增加26.49升/秒(2288.7立方米/天)的产水量。人均需水量为11.48升/c/d,低于世界卫生组织的基本用水标准20升/c/d。现有产水的总收益水和非收益水分别为525.18 m3 /d和194.81 m3 /d。约48%的卫生保健机构从现有的供水管道获得初级水,其余52%的卫生保健机构从未连接的水源获得初级水。为了缩小供需差距,应扩大供水服务和提供额外的水源。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
International Journal of Human Resources Development and Management
International Journal of Human Resources Development and Management Business, Management and Accounting-Organizational Behavior and Human Resource Management
CiteScore
1.60
自引率
0.00%
发文量
24
期刊介绍: IJHRDM is established to cover all issues that arise when dealing with the most important of all resources - the human resource. This includes issues that are related to their growth and development as a tool in the workplace (e.g. skill training and proficiency enhancement) and in managing them effectively as a resource. The workplace is defined very broadly - it could be in a manufacturing setting or in a service setting in a changing and dynamic global environment. IJHRDM provides a refereed and authoritative source of information on aspects of human resources development and management, in manufacturing and services enterprises in a changing and dynamic global environment.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信