{"title":"CRITICAL FACTORS AND BENEFITS IN THE USE OF EARNED VALUE MANAGEMENT IN CONSTRUCTION","authors":"Joaquim Teixeira Netto, Nylvandir Liberato Fernandes de Oliveira, A. Freitas, João Alberto Neves dos Santos","doi":"10.14488/bjopm.2020.007","DOIUrl":null,"url":null,"abstract":"João Alberto Neves dos Santos joaoalbertoneves@gmail.com ABSTRACT Goal: The main objective of this study is to analyze the benefits and the critical success factors (CSF) to use of Earned Value Management (EVM) in the construction projects. Design / Methodology / Approach: The research methodology was quantitative approach with statistical analysis of questionnaire with 106 answered and validated using the Cronbach’s alpha and Kaiser-Meyer-Olkin. Results: The construction companies identified the benefits and CSF in the use of EVM. The observed benefits were: achieving project cost, the definition of scope and schedule, anticipating project and project communication. The observed CSF were: team training, project management maturity, top management support, the need of pre-defined procedures, and the use of appropriate software. Limitations of the investigation: The sample of research was composed exclusively of Brazilian construction managers. Practical implications: Monitoring construction projects using EVM for construction companies. Originality / Value: The EVM is widely used for project management. However, there are few studies on its use in the construction industry.","PeriodicalId":54139,"journal":{"name":"Brazilian Journal of Operations & Production Management","volume":"22 1","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Brazilian Journal of Operations & Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14488/bjopm.2020.007","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 6
Abstract
João Alberto Neves dos Santos joaoalbertoneves@gmail.com ABSTRACT Goal: The main objective of this study is to analyze the benefits and the critical success factors (CSF) to use of Earned Value Management (EVM) in the construction projects. Design / Methodology / Approach: The research methodology was quantitative approach with statistical analysis of questionnaire with 106 answered and validated using the Cronbach’s alpha and Kaiser-Meyer-Olkin. Results: The construction companies identified the benefits and CSF in the use of EVM. The observed benefits were: achieving project cost, the definition of scope and schedule, anticipating project and project communication. The observed CSF were: team training, project management maturity, top management support, the need of pre-defined procedures, and the use of appropriate software. Limitations of the investigation: The sample of research was composed exclusively of Brazilian construction managers. Practical implications: Monitoring construction projects using EVM for construction companies. Originality / Value: The EVM is widely used for project management. However, there are few studies on its use in the construction industry.