{"title":"Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects -","authors":"Kyuman Cho, Kim, Taehoon","doi":"10.5345/JKIBC.2018.18.4.385","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":17348,"journal":{"name":"Journal of the Korean Institute of Building Construction","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Korean Institute of Building Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5345/JKIBC.2018.18.4.385","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}