{"title":"Strasbourg MP 10-report","authors":"J.C. Oberlin, M. Letournel, G. Heng","doi":"10.1016/0029-554X(81)90849-1","DOIUrl":null,"url":null,"abstract":"<div><p>Since the Ebeltoft meeting, the MP-10 has run essentially for research at normal running specifications up to 13 MV for the first year. The belt is still a standard HVEC belt but mounted in a half open structure. It has accumulated more than 9000 h. Since August 1979, the time has been mainly devoted to our up-grading project and problems associated with this.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 61-66"},"PeriodicalIF":0.0000,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90849-1","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Instruments and Methods","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0029554X81908491","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
Since the Ebeltoft meeting, the MP-10 has run essentially for research at normal running specifications up to 13 MV for the first year. The belt is still a standard HVEC belt but mounted in a half open structure. It has accumulated more than 9000 h. Since August 1979, the time has been mainly devoted to our up-grading project and problems associated with this.