Collapsed Pittsburgh bridge replaced in less than a year

IF 0.9 4区 工程技术 Q4 CONSTRUCTION & BUILDING TECHNOLOGY
PCI Journal Pub Date : 2023-01-01 DOI:10.15554/pcij68.3-06
W. Atkinson
{"title":"Collapsed Pittsburgh bridge replaced in less than a year","authors":"W. Atkinson","doi":"10.15554/pcij68.3-06","DOIUrl":null,"url":null,"abstract":"This Project Spotlight discusses how using precast concrete enabled the rapid replacement of Pittsburgh's Fern Hollow Bridge after the January 2022 collapse.","PeriodicalId":54637,"journal":{"name":"PCI Journal","volume":"1 1","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PCI Journal","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.15554/pcij68.3-06","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

This Project Spotlight discusses how using precast concrete enabled the rapid replacement of Pittsburgh's Fern Hollow Bridge after the January 2022 collapse.
倒塌的匹兹堡大桥在不到一年的时间里被重建
本项目重点讨论了如何使用预制混凝土在2022年1月倒塌后快速更换匹兹堡的Fern空心桥。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
PCI Journal
PCI Journal 工程技术-结构与建筑技术
自引率
9.10%
发文量
15
审稿时长
>12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信