Estimation of the excavator actual productivity at the construction site using video analysis

IF 1.6 Q3 MANAGEMENT
M. Šopić, M. Vukomanović, D. Car-Pušić, I. Zavrski
{"title":"Estimation of the excavator actual productivity at the construction site using video analysis","authors":"M. Šopić, M. Vukomanović, D. Car-Pušić, I. Zavrski","doi":"10.2478/otmcj-2021-0003","DOIUrl":null,"url":null,"abstract":"Abstract Current estimates of the actual productivity of heavy construction machinery at a construction site are not supported by an appropriate and widely used methodology. Recently, for the purpose of estimating the actual productivity of heavy construction machinery, vision-based technologies are used. This paper emphasizes the importance of estimating actual productivity and presents a way (i.e. a research framework) to achieve it. Therefore, the aim of this paper is to propose a simple research framework (SRF) for quick and practical estimates of excavator actual productivity and cycle time at a construction site. The excavator actual productivity refers to the maximum possible productivity in real construction site conditions. The SRF includes the use of a video camera and the analysis of recorded videos using an advanced computer program. In cases of continuous application of SRF, a clear and transparent base for monitoring and control of earthworks can be obtained at an observed construction site.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"13 1","pages":"2341 - 2352"},"PeriodicalIF":1.6000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2021-0003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 7

Abstract

Abstract Current estimates of the actual productivity of heavy construction machinery at a construction site are not supported by an appropriate and widely used methodology. Recently, for the purpose of estimating the actual productivity of heavy construction machinery, vision-based technologies are used. This paper emphasizes the importance of estimating actual productivity and presents a way (i.e. a research framework) to achieve it. Therefore, the aim of this paper is to propose a simple research framework (SRF) for quick and practical estimates of excavator actual productivity and cycle time at a construction site. The excavator actual productivity refers to the maximum possible productivity in real construction site conditions. The SRF includes the use of a video camera and the analysis of recorded videos using an advanced computer program. In cases of continuous application of SRF, a clear and transparent base for monitoring and control of earthworks can be obtained at an observed construction site.
使用视频分析估算挖掘机在施工现场的实际生产率
摘要目前对施工现场重型施工机械实际生产力的估计没有得到适当和广泛使用的方法的支持。最近,为了估计重型工程机械的实际生产率,使用了基于视觉的技术。本文强调了估计实际生产力的重要性,并提出了一种实现实际生产力的方法(即研究框架)。因此,本文的目的是提出一个简单的研究框架(SRF),用于快速、实用地估计挖掘机在施工现场的实际生产力和循环时间。挖掘机实际生产率是指在实际施工现场条件下可能达到的最大生产率。SRF包括使用摄像机和使用高级计算机程序分析录制的视频。在连续应用SRF的情况下,可以在观察到的施工现场获得用于监测和控制土方工程的清晰透明的基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信