7D BIM FOR SUSTAINABILITY ASSESSMENT IN DESIGN PROCESSES: A CASE STUDY OF DESIGN OF ALTERNATIVES IN SEVERE CLIMATE AND HEAVY USE CONDITIONS

Q1 Engineering
M. Andreani, Stefano Bertagni, C. Biagini, Filippo Mallo
{"title":"7D BIM FOR SUSTAINABILITY ASSESSMENT IN DESIGN PROCESSES: A CASE STUDY OF DESIGN OF ALTERNATIVES IN SEVERE CLIMATE AND HEAVY USE CONDITIONS","authors":"M. Andreani, Stefano Bertagni, C. Biagini, Filippo Mallo","doi":"10.23968/2500-0055-2019-4-2-3-12","DOIUrl":null,"url":null,"abstract":"Introduction: The emerging of energy and environmental thread has fostered a new cultural design approach to Sustainable Architecture that aims to conceive and implement buildings with a low environmental impact. In this context the role of Building Information Modelling (BIM), as a support tool for sustainable integrated design, acquires great relevance. The purpose of this study is to investigate BIM potential in both addressing preliminary design choices and supporting complex analysis during the advanced design phase, within the whole sustainable design process. A technological rail building is assumed as a case study: the Operation Control Centre for the new Oman Railway, whose preliminary project was elaborated by the Italian engineering society Italferr s.p.a. Methods: The BIM approach is used to identify possible problems and deficiencies in the preliminary project, which may represent a good basis for a next design improvements proposal. The next phase consists in investigating and experimenting BIM tools potential in supporting the Conceptual Design, by using Autodesk® Revit® and IES VE® software suites, for the modelling and the energy analysis of different conceptual design solutions. Once the optimal building shape is established, the study focuses on the evaluation of sustainability effects brought by the structural building component, in particular for what concerns its materials environmental impact. Results and discussion: The analysis of the preliminary project shows the potential of BIM in the control of many performance parameters of a building in the design phase, revealing all the design problems associated to the lack of an integral multi-disciplinary approach during the initial phases of the process. The possibility of looking into a series of solutions in a quick and in-depth manner permits an accurate assessment of the most adequate form for a building based on the place in which it is set, thus joining current technological design methods to traditional bio-climatic methods, reinstating the strong and inevitable link between site and building.","PeriodicalId":52295,"journal":{"name":"Architecture and Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Architecture and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23968/2500-0055-2019-4-2-3-12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 12

Abstract

Introduction: The emerging of energy and environmental thread has fostered a new cultural design approach to Sustainable Architecture that aims to conceive and implement buildings with a low environmental impact. In this context the role of Building Information Modelling (BIM), as a support tool for sustainable integrated design, acquires great relevance. The purpose of this study is to investigate BIM potential in both addressing preliminary design choices and supporting complex analysis during the advanced design phase, within the whole sustainable design process. A technological rail building is assumed as a case study: the Operation Control Centre for the new Oman Railway, whose preliminary project was elaborated by the Italian engineering society Italferr s.p.a. Methods: The BIM approach is used to identify possible problems and deficiencies in the preliminary project, which may represent a good basis for a next design improvements proposal. The next phase consists in investigating and experimenting BIM tools potential in supporting the Conceptual Design, by using Autodesk® Revit® and IES VE® software suites, for the modelling and the energy analysis of different conceptual design solutions. Once the optimal building shape is established, the study focuses on the evaluation of sustainability effects brought by the structural building component, in particular for what concerns its materials environmental impact. Results and discussion: The analysis of the preliminary project shows the potential of BIM in the control of many performance parameters of a building in the design phase, revealing all the design problems associated to the lack of an integral multi-disciplinary approach during the initial phases of the process. The possibility of looking into a series of solutions in a quick and in-depth manner permits an accurate assessment of the most adequate form for a building based on the place in which it is set, thus joining current technological design methods to traditional bio-climatic methods, reinstating the strong and inevitable link between site and building.
7D-BIM在设计过程中的可持续性评估&以恶劣气候和大量使用条件下的替代品设计为例
引言:能源和环境主题的出现为可持续建筑培养了一种新的文化设计方法,旨在构思和实施对环境影响较小的建筑。在这种情况下,建筑信息建模(BIM)作为可持续综合设计的支持工具,其作用具有重要意义。本研究的目的是调查BIM在整个可持续设计过程中,在高级设计阶段解决初步设计选择和支持复杂分析方面的潜力。假设一座技术性铁路建筑作为案例研究:新阿曼铁路运营控制中心,其初步项目由意大利工程协会Italferr s.p.A制定。方法:BIM方法用于识别初步项目中可能存在的问题和不足,这可能为下一步的设计改进提案提供良好的基础。下一阶段是通过使用Autodesk®Revit®和IES VE®软件套件,研究和试验BIM工具在支持概念设计方面的潜力,用于不同概念设计解决方案的建模和能量分析。一旦确定了最佳建筑形状,该研究将重点评估结构建筑组件带来的可持续性影响,特别是其材料对环境的影响。结果和讨论:对初步项目的分析显示了BIM在设计阶段控制建筑许多性能参数的潜力,揭示了在设计过程的初始阶段缺乏综合多学科方法所带来的所有设计问题。通过快速深入地研究一系列解决方案,可以根据建筑的位置准确评估建筑的最合适形式,从而将当前的技术设计方法与传统的生物气候方法相结合,恢复场地和建筑之间强有力且不可避免的联系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Architecture and Engineering
Architecture and Engineering Engineering-Architecture
CiteScore
1.80
自引率
0.00%
发文量
26
审稿时长
7 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信