Nuevo puente Champlain sobre el río San Lorenzo en Montreal. Diseño de las estructuras auxiliares para la construcción del puente atirantado

IF 0.1 Q4 ENGINEERING, CIVIL
Hugo Corres Peiretti, A. P. Caldentey, Javier Milián Mateos, Alejandro Abel Núñez, Antonio Romero Balleteros, Conchita Lucas Serrano
{"title":"Nuevo puente Champlain sobre el río San Lorenzo en Montreal. Diseño de las estructuras auxiliares para la construcción del puente atirantado","authors":"Hugo Corres Peiretti, A. P. Caldentey, Javier Milián Mateos, Alejandro Abel Núñez, Antonio Romero Balleteros, Conchita Lucas Serrano","doi":"10.33586/HYA.2020.2320","DOIUrl":null,"url":null,"abstract":"This article summarizes the design of the temporary structures used for the construction of the New Champlan Bridge in Montreal (Canadá). The complexity of the structure of the cable-stayed bridge, with a total width of 60 m and a strong asymmetry in elevation and in cross section, has been a real challenge for the design of the temporary works and assembly operations. It is explained in detail the singularity of the assembly and bolting operation of the Main Span segments, comprised of three composite box girders joined together by transverse girders. PALABRAS CLAVE: puente atirantado, estructuras auxiliares, atornillado, izado, ensamblaje","PeriodicalId":41423,"journal":{"name":"Hormigon y Acero","volume":" ","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2020-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hormigon y Acero","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33586/HYA.2020.2320","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

This article summarizes the design of the temporary structures used for the construction of the New Champlan Bridge in Montreal (Canadá). The complexity of the structure of the cable-stayed bridge, with a total width of 60 m and a strong asymmetry in elevation and in cross section, has been a real challenge for the design of the temporary works and assembly operations. It is explained in detail the singularity of the assembly and bolting operation of the Main Span segments, comprised of three composite box girders joined together by transverse girders. PALABRAS CLAVE: puente atirantado, estructuras auxiliares, atornillado, izado, ensamblaje
蒙特利尔圣劳伦斯河上的新尚普兰桥。斜拉桥施工辅助结构设计
本文总结了蒙特利尔(Canadá)新尚普兰大桥施工临时结构的设计。斜拉桥总宽60米,高度和横截面高度不对称,结构复杂,这对临时工程的设计和组装作业构成了真正的挑战。详细解释了主跨节段的组装和螺栓连接操作的独特性,主跨节由三个由横梁连接在一起的组合箱梁组成。PALABRAS CLAVE:puente atirantado,estructuras auxiliares,atornillado,izado,ensambraje
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Hormigon y Acero
Hormigon y Acero ENGINEERING, CIVIL-
CiteScore
0.50
自引率
0.00%
发文量
4
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信