A structured literature review on construction conflict prevention and resolution: A modified approach for engineering

IF 1.6 Q3 MANAGEMENT
Omar Sabri, O. Lædre, A. Bruland
{"title":"A structured literature review on construction conflict prevention and resolution: A modified approach for engineering","authors":"Omar Sabri, O. Lædre, A. Bruland","doi":"10.2478/otmcj-2022-0006","DOIUrl":null,"url":null,"abstract":"Abstract In the face of several uncertainties in the construction industry, conflicts and disputes seem inevitable. The aim of this systematic literature review of methodologies for prevention and resolution of conflicts was to develop an updated guidance for conflict management in the construction industry. To achieve this, we developed a novel tool termed Modified Reporting Items for Structured Reviews in Engineering and Technology (MORISE) that considered a modified tool from the original literature review method Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA). Three databases, ScienceDirect, Scopus, and American Society for Civil Engineers (ASCE), were searched and 61 articles were shortlisted. In terms of frequency of reasons cited as causes for disputes, payment regimes and delays rank first, followed by written agreement interpretation and changes in projects. Acceptable approaches to resolution of disputes include negotiation, arbitration, facilitation, and dispute resolution boards. This study were able to make a clear distinction between methodologies adopted by various researchers for the prevention and resolution of conflicts and show that in addition to prevention of conflicts, there are comprehensive and suitable techniques to resolve conflicts, which can be adopted in practice.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"14 1","pages":"2616 - 2630"},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2022-0006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 3

Abstract

Abstract In the face of several uncertainties in the construction industry, conflicts and disputes seem inevitable. The aim of this systematic literature review of methodologies for prevention and resolution of conflicts was to develop an updated guidance for conflict management in the construction industry. To achieve this, we developed a novel tool termed Modified Reporting Items for Structured Reviews in Engineering and Technology (MORISE) that considered a modified tool from the original literature review method Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA). Three databases, ScienceDirect, Scopus, and American Society for Civil Engineers (ASCE), were searched and 61 articles were shortlisted. In terms of frequency of reasons cited as causes for disputes, payment regimes and delays rank first, followed by written agreement interpretation and changes in projects. Acceptable approaches to resolution of disputes include negotiation, arbitration, facilitation, and dispute resolution boards. This study were able to make a clear distinction between methodologies adopted by various researchers for the prevention and resolution of conflicts and show that in addition to prevention of conflicts, there are comprehensive and suitable techniques to resolve conflicts, which can be adopted in practice.
建筑冲突预防和解决的结构化文献综述:一种改进的工程方法
面对建筑行业的诸多不确定性,矛盾和纠纷似乎不可避免。对预防和解决冲突的方法进行系统的文献综述的目的是为建筑行业的冲突管理制定最新的指导方针。为了实现这一目标,我们开发了一种新的工具,称为工程和技术结构化评论的修改报告项目(MORISE),它考虑了原始文献综述方法的修改工具,即系统评论和荟萃分析的首选报告项目(PRISMA)。检索了三个数据库:ScienceDirect、Scopus和美国土木工程师学会(ASCE),最终有61篇文章入围。就引发纠纷的原因频率而言,付款制度和延误排在第一位,其次是书面协议解释和项目变更。可接受的解决争议的方法包括谈判、仲裁、调解和争议解决委员会。本研究能够明确区分不同研究者在预防和解决冲突方面所采用的方法,并表明除了预防冲突之外,还有全面而合适的解决冲突的技术,这些技术可以在实践中采用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信