{"title":"The relation between the cost impact and mismanagement in the Middle East construction projects","authors":"Forat Al-Sahar","doi":"10.22630/PNIKS.2019.28.2.19","DOIUrl":null,"url":null,"abstract":"The creations of construction projects firstly try to achieve several specific goals. Effective projects are believed when these goals achieved. The principal concerns are to cross the downsides and defects. The stage of the performance project may be the most significant, crucial and drains of the resources through the project life cycle, its dependence on monitoring by professional in order to exceeded things blocking the path and accomplish the project plan exactly. The targets of the study are to diagnosis the actual reasons and locating the relation of mismanagement of the project execution stage and measure their influence on the cost. The study achieved and diagnoses many problems that have a negative impact on the projects management implementation as well as the effects of the cost by using many ways to reaching the target. There are 22 problems it is the main reasons that deviation the cost plus they obtain agreement level number according to Likert scale quintet.","PeriodicalId":38397,"journal":{"name":"Scientific Review Engineering and Environmental Sciences","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Review Engineering and Environmental Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22630/PNIKS.2019.28.2.19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0
Abstract
The creations of construction projects firstly try to achieve several specific goals. Effective projects are believed when these goals achieved. The principal concerns are to cross the downsides and defects. The stage of the performance project may be the most significant, crucial and drains of the resources through the project life cycle, its dependence on monitoring by professional in order to exceeded things blocking the path and accomplish the project plan exactly. The targets of the study are to diagnosis the actual reasons and locating the relation of mismanagement of the project execution stage and measure their influence on the cost. The study achieved and diagnoses many problems that have a negative impact on the projects management implementation as well as the effects of the cost by using many ways to reaching the target. There are 22 problems it is the main reasons that deviation the cost plus they obtain agreement level number according to Likert scale quintet.
期刊介绍:
Scientific Review Engineering and Environmental Sciences [Przegląd Naukowy Inżynieria i Kształtowanie Środowiska] covers broad area of knowledge and practice on fields such as: sustainable development, landscaping of non-urbanized lands, environmental engineering, construction projects engineering land management, protection and land reclamation, environmental impact of investments, ecology, hydrology and water management, ground-water monitoring and restoration, geotechnical engineering, meteorology and connecting subjects. Authors are welcome to submit theoretical and practice-oriented papers containing detailed case studies within above mentioned disciplines. However, theoretical papers should contain part with practical application of the theory presented. Papers (in Polish or English languages) are accepted for publication after obtaining positive opinions of two reviewers. Papers published elsewhere are not accepted.