Significant factors affecting the New Zealand transportation infrastructure project cost – quantity surveyors' perception

IF 1.9 Q3 ENGINEERING, CIVIL
C. Atapattu, N. Domingo, M. Sutrisna
{"title":"Significant factors affecting the New Zealand transportation infrastructure project cost – quantity surveyors' perception","authors":"C. Atapattu, N. Domingo, M. Sutrisna","doi":"10.1108/bepam-07-2022-0105","DOIUrl":null,"url":null,"abstract":"PurposeCost overrun is one of the critical issues faced in construction projects, as nine out of ten projects will likely go over the budget. In particular, transportation infrastructure (TI) projects, such as roads and bridges, are vastly affected by cost overruns, which can delay the entire project. This research intends to identify the factors affecting the cost overruns in New Zealand (NZ) TI projects.Design/methodology/approachThe research was conducted using a questionnaire survey involving ninety-two participants experienced in infrastructure project estimation in NZ. Quantitative methods were used to analyse the data.FindingsFifty-three factors were identified through literature under ten categories. Based on the survey, ten significant factors were identified with a high grade of importance. The three most critical factors were “frequent design changes,” “poor planning and scheduling” and “inadequate tender documentation.” It was found that the cost overrun is primarily affected by the pre-contract stage causes.Research limitations/implicationsThe data were collected from professionals involved in NZTI projects. Therefore, the implications may be different for other contexts.Practical implicationsThe results will improve the current estimation practice by developing a new statistical model considering all the significant variables for NZTI projects.Originality/valueAlthough much research is done to identify these factors, they are only considered in a few statistical cost models. These new statistical models mainly focused on technical variable factors similar to the current standard estimation process. However, the results of this research, qualitative and quantitative factors, will be used for the future cost model.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2023-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Built Environment Project and Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/bepam-07-2022-0105","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

PurposeCost overrun is one of the critical issues faced in construction projects, as nine out of ten projects will likely go over the budget. In particular, transportation infrastructure (TI) projects, such as roads and bridges, are vastly affected by cost overruns, which can delay the entire project. This research intends to identify the factors affecting the cost overruns in New Zealand (NZ) TI projects.Design/methodology/approachThe research was conducted using a questionnaire survey involving ninety-two participants experienced in infrastructure project estimation in NZ. Quantitative methods were used to analyse the data.FindingsFifty-three factors were identified through literature under ten categories. Based on the survey, ten significant factors were identified with a high grade of importance. The three most critical factors were “frequent design changes,” “poor planning and scheduling” and “inadequate tender documentation.” It was found that the cost overrun is primarily affected by the pre-contract stage causes.Research limitations/implicationsThe data were collected from professionals involved in NZTI projects. Therefore, the implications may be different for other contexts.Practical implicationsThe results will improve the current estimation practice by developing a new statistical model considering all the significant variables for NZTI projects.Originality/valueAlthough much research is done to identify these factors, they are only considered in a few statistical cost models. These new statistical models mainly focused on technical variable factors similar to the current standard estimation process. However, the results of this research, qualitative and quantitative factors, will be used for the future cost model.
影响新西兰交通基础设施项目造价的重要因素——量测师的认知
目的成本超支是建筑项目面临的关键问题之一,因为十分之九的项目可能会超出预算。特别是,道路和桥梁等交通基础设施项目受到成本超支的严重影响,这可能会推迟整个项目。本研究旨在确定影响新西兰TI项目成本超支的因素。设计/方法/方法本研究采用问卷调查进行,涉及92名在新西兰有基础设施项目评估经验的参与者。使用定量方法分析数据。研究结果通过10个类别的文献,确定了53个因素。根据调查,确定了10个重要程度较高的重要因素。三个最关键的因素是“频繁的设计变更”、“糟糕的规划和进度安排”以及“不充分的招标文件”。研究发现,成本超支主要受合同前阶段原因的影响。研究局限性/含义数据是从参与NZTI项目的专业人士那里收集的。因此,其他情况下的含义可能不同。实际含义该结果将通过开发一个新的统计模型来改进当前的估算实践,该模型考虑了NZTI项目的所有重要变量。原创性/价值尽管已经做了很多研究来确定这些因素,但它们只在少数统计成本模型中被考虑。这些新的统计模型主要关注与当前标准估计过程类似的技术变量因素。然而,本研究的结果,定性和定量因素,将用于未来的成本模型。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
4.30
自引率
9.10%
发文量
41
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信