Nithin Saravana Marthandam, Ean H. Ng, Javier Calvo-Amodio, Chinmay Narwankar, L. A. Barroso
{"title":"Validating a model for forecasting the project termination phase using existing business cases","authors":"Nithin Saravana Marthandam, Ean H. Ng, Javier Calvo-Amodio, Chinmay Narwankar, L. A. Barroso","doi":"10.1080/0013791X.2018.1555299","DOIUrl":null,"url":null,"abstract":"Abstract Studies on project failure and its subsequent termination phase are scarce; studies that use a quantitative approach are almost nonexistent. This is most likely because organizations usually do not collect data on project failures, are unable to share such data, or a combination of both. The contribution of this article is twofold: to (1) showcase a methodology to validate a model using actual business cases and (2) validate a project termination phase forecast model (PTPFM) using the methodology. The model is validated through four business cases, comparing the results from the model to the decisions made in reality.","PeriodicalId":49210,"journal":{"name":"Engineering Economist","volume":"64 1","pages":"142 - 166"},"PeriodicalIF":1.0000,"publicationDate":"2019-02-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/0013791X.2018.1555299","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Economist","FirstCategoryId":"96","ListUrlMain":"https://doi.org/10.1080/0013791X.2018.1555299","RegionNum":4,"RegionCategory":"经济学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"BUSINESS","Score":null,"Total":0}
引用次数: 0
Abstract
Abstract Studies on project failure and its subsequent termination phase are scarce; studies that use a quantitative approach are almost nonexistent. This is most likely because organizations usually do not collect data on project failures, are unable to share such data, or a combination of both. The contribution of this article is twofold: to (1) showcase a methodology to validate a model using actual business cases and (2) validate a project termination phase forecast model (PTPFM) using the methodology. The model is validated through four business cases, comparing the results from the model to the decisions made in reality.
Engineering EconomistENGINEERING, INDUSTRIAL-OPERATIONS RESEARCH & MANAGEMENT SCIENCE
CiteScore
2.00
自引率
0.00%
发文量
14
审稿时长
>12 weeks
期刊介绍:
The Engineering Economist is a refereed journal published jointly by the Engineering Economy Division of the American Society of Engineering Education (ASEE) and the Institute of Industrial and Systems Engineers (IISE). The journal publishes articles, case studies, surveys, and book and software reviews that represent original research, current practice, and teaching involving problems of capital investment.
The journal seeks submissions in a number of areas, including, but not limited to: capital investment analysis, financial risk management, cost estimation and accounting, cost of capital, design economics, economic decision analysis, engineering economy education, research and development, and the analysis of public policy when it is relevant to the economic investment decisions made by engineers and technology managers.