Performance analysis of small and medium-sized construction firms in Oyo State, Nigeria

IF 0.6 Q4 MANAGEMENT
A. O. Abosede, A. Opawole, Babalola Olubola, G. Ojo
{"title":"Performance analysis of small and medium-sized construction firms in Oyo State, Nigeria","authors":"A. O. Abosede, A. Opawole, Babalola Olubola, G. Ojo","doi":"10.18820/24150487/AS26I1.3","DOIUrl":null,"url":null,"abstract":"This article examines time and cost performance of projects executed by small and medium-sized construction firms with a view to enhancing the firms’ capabilities. The study adopted a quantitative descriptive analysis based on primary and archival data. Sixty-eight (68) valid questionnaires obtained from top managers of the firms provided primary quantitative data for the assessment. Secondary data were collected on the initial and final contract sums as well as on the initial and completion times of 184 public projects executed by the firms. Data collected were analysed using descriptive analysis. The findings indicated that the small firms specialised in general building works, while the medium-sized firms specialised in civil works, in addition to general building works. Project values in the case of small construction firms ranged between N1 million and N50 million, while those of medium-sized construction firms ranged between N51 million and N100 million. The performance index (PI) of the projects executed by the firms showed a general underperformance level. Approximately","PeriodicalId":42571,"journal":{"name":"Acta Structilia","volume":" ","pages":""},"PeriodicalIF":0.6000,"publicationDate":"2019-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Structilia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18820/24150487/AS26I1.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 4

Abstract

This article examines time and cost performance of projects executed by small and medium-sized construction firms with a view to enhancing the firms’ capabilities. The study adopted a quantitative descriptive analysis based on primary and archival data. Sixty-eight (68) valid questionnaires obtained from top managers of the firms provided primary quantitative data for the assessment. Secondary data were collected on the initial and final contract sums as well as on the initial and completion times of 184 public projects executed by the firms. Data collected were analysed using descriptive analysis. The findings indicated that the small firms specialised in general building works, while the medium-sized firms specialised in civil works, in addition to general building works. Project values in the case of small construction firms ranged between N1 million and N50 million, while those of medium-sized construction firms ranged between N51 million and N100 million. The performance index (PI) of the projects executed by the firms showed a general underperformance level. Approximately
尼日利亚奥约州中小型建筑公司绩效分析
本文考察了中小型建筑企业执行项目的时间和成本效益,以期提高企业的能力。该研究采用了基于原始数据和档案数据的定量描述性分析。从这些公司的高级管理人员那里获得的六十八(68)份有效问卷为评估提供了主要的定量数据。收集了关于这些公司执行的184个公共项目的初始和最终合同金额以及初始和完成时间的次要数据。使用描述性分析对收集的数据进行分析。调查结果显示,除了一般建筑工程外,小型公司还专门从事一般建筑工程,而中型公司则专门从事土木工程。小型建筑公司的项目价值在100万至5000万奈拉之间,而中型建筑公司的价值在1100万至1亿奈拉之间。这些公司执行的项目的绩效指数(PI)总体表现不佳。大概
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Acta Structilia
Acta Structilia MANAGEMENT-
自引率
14.30%
发文量
0
审稿时长
18 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信