Construction Strategic Project Readiness Assessment

Q2 Business, Management and Accounting
Mahdi Safa, Kelly Weeks, Ashraf F. Elhoubi, Nomita Sharma, Sandra MacGillivray
{"title":"Construction Strategic Project Readiness Assessment","authors":"Mahdi Safa, Kelly Weeks, Ashraf F. Elhoubi, Nomita Sharma, Sandra MacGillivray","doi":"10.32738/jeppm-2022-0002","DOIUrl":null,"url":null,"abstract":"Proper use of construction strategic management consists of strategic planning for controlling the implementation of strategies during front-end planning (FEP). To improve FEP effort, industry best practice instrument, i.e., Project Definition Rating Index (PDRI) has been used to ensure continued alignment and focus on strategic project priorities. This study proposes a methodology for creating a SWOT (strengths, weaknesses, opportunities, and threats) analysis of big post-mining data from organizations that have implemented PDRI, as a standardized tool used across capital project portfolios. The results show that the proposed methodology has the potential to improve project success when applied as a benchmark of baseline conditions, the element level.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32738/jeppm-2022-0002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 1

Abstract

Proper use of construction strategic management consists of strategic planning for controlling the implementation of strategies during front-end planning (FEP). To improve FEP effort, industry best practice instrument, i.e., Project Definition Rating Index (PDRI) has been used to ensure continued alignment and focus on strategic project priorities. This study proposes a methodology for creating a SWOT (strengths, weaknesses, opportunities, and threats) analysis of big post-mining data from organizations that have implemented PDRI, as a standardized tool used across capital project portfolios. The results show that the proposed methodology has the potential to improve project success when applied as a benchmark of baseline conditions, the element level.
建设战略项目准备评估
施工战略管理的正确使用包括在前端规划(FEP)期间控制战略实施的战略规划。为了改进FEP工作,使用了行业最佳实践工具,即项目定义评级指数(PDII),以确保持续一致并关注战略项目优先事项。本研究提出了一种方法,用于对实施PDRI的组织的大型挖掘后数据进行SWOT(优势、劣势、机会和威胁)分析,作为资本项目组合中使用的标准化工具。结果表明,如果将所提出的方法作为基准条件(要素水平)的基准,则有可能提高项目的成功率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信