Perry Bar & Witton FRMS: Forge Mill Flood Storage Area – Lessons Learnt

Q4 Earth and Planetary Sciences
Ciara Gill
{"title":"Perry Bar & Witton FRMS: Forge Mill Flood Storage Area – Lessons Learnt","authors":"Ciara Gill","doi":"10.1680/jdare.22.00093","DOIUrl":null,"url":null,"abstract":"The Perry Barr and Witton Flood Risk Management Scheme in Birmingham protects over 1,300 properties from a 1% Annual Exceedance Probability flood event. A key component of the scheme is the Forge Mill flood storage area. Construction started in 2018 with the Preliminary Certificate signed off in spring 2022. This paper will discuss the project and share lessons learnt from the construction phase. The lessons learnt cover a variety of areas including programme considerations, use of erosion protection matting, trash screen management and use of 3D models in construction.","PeriodicalId":39070,"journal":{"name":"Dams and Reservoirs","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Dams and Reservoirs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jdare.22.00093","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

The Perry Barr and Witton Flood Risk Management Scheme in Birmingham protects over 1,300 properties from a 1% Annual Exceedance Probability flood event. A key component of the scheme is the Forge Mill flood storage area. Construction started in 2018 with the Preliminary Certificate signed off in spring 2022. This paper will discuss the project and share lessons learnt from the construction phase. The lessons learnt cover a variety of areas including programme considerations, use of erosion protection matting, trash screen management and use of 3D models in construction.
佩里酒吧和威顿FRMS:锻造厂洪水储存区-吸取教训
伯明翰的Perry Barr和Witton洪水风险管理计划保护了1300多处房产免受每年超过概率1%的洪水事件的影响。该方案的一个关键组成部分是Forge Mill储洪区。2018年开始建设,2022年春季签署了初步证书。本文将讨论该项目并分享从施工阶段吸取的经验教训。吸取的经验教训涵盖了各种领域,包括方案考虑、使用防侵蚀垫地、垃圾屏风管理和在施工中使用3D模型。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Dams and Reservoirs
Dams and Reservoirs Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.50
自引率
0.00%
发文量
30
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信