Assessing Financial Risk in Public-Private Partnership Financing for Road Construction Projects in Iran Using Uncertainty Conditions Approach

IF 1 Q4 ENGINEERING, CIVIL
M. Jaafarian, A. Ardeshir, A. F. Boyaghchi
{"title":"Assessing Financial Risk in Public-Private Partnership Financing for Road Construction Projects in Iran Using Uncertainty Conditions Approach","authors":"M. Jaafarian, A. Ardeshir, A. F. Boyaghchi","doi":"10.2478/jaes-2020-0021","DOIUrl":null,"url":null,"abstract":"Abstract Private section investment in the construction of transportation infrastructure, one of the most important of which is freeway projects, has been extensively used in developing countries in recent decades. However, in many cases due to the lack of necessary investigations and studies, the criteria have not been properly identified and, as a result, the proper way of participating in large-scale transport projects has resulted in numerous problems and, in some cases, project failure. However, choosing a private-public partnership will have a major impact on the success of freeway construction. However, due to the current conditions of the country’s economy, these projects are following with some risks. Therefore, in this study, the financial risk assessment of “public-private partnership” financing for road construction projects in Iran was investigated using the uncertainty approach and the BAS method. The research population of this study consisted of 23 researchers and experts with Ph.D. degree in finance with minimum degree of associate degree and experience of research and financial consulting in investment firms. According to the results, the lack of stability in planning and implementation of government programs and political risks, increases the risk of road construction projects and, in this regard, controlling the price fluctuations and bank financing of road construction projects can reduce the risk of these projects.","PeriodicalId":44808,"journal":{"name":"Journal of Applied Engineering Sciences","volume":"10 1","pages":"139 - 146"},"PeriodicalIF":1.0000,"publicationDate":"2020-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Applied Engineering Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jaes-2020-0021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract Private section investment in the construction of transportation infrastructure, one of the most important of which is freeway projects, has been extensively used in developing countries in recent decades. However, in many cases due to the lack of necessary investigations and studies, the criteria have not been properly identified and, as a result, the proper way of participating in large-scale transport projects has resulted in numerous problems and, in some cases, project failure. However, choosing a private-public partnership will have a major impact on the success of freeway construction. However, due to the current conditions of the country’s economy, these projects are following with some risks. Therefore, in this study, the financial risk assessment of “public-private partnership” financing for road construction projects in Iran was investigated using the uncertainty approach and the BAS method. The research population of this study consisted of 23 researchers and experts with Ph.D. degree in finance with minimum degree of associate degree and experience of research and financial consulting in investment firms. According to the results, the lack of stability in planning and implementation of government programs and political risks, increases the risk of road construction projects and, in this regard, controlling the price fluctuations and bank financing of road construction projects can reduce the risk of these projects.
用不确定性条件法评估伊朗公路建设项目公私合作融资的财务风险
摘要近几十年来,私人部门投资在发展中国家广泛应用于交通基础设施建设,其中最重要的是高速公路项目。然而,在许多情况下,由于缺乏必要的调查和研究,没有适当确定标准,因此,参与大型运输项目的适当方式导致了许多问题,在某些情况下,项目失败。然而,选择公私合作将对高速公路建设的成功产生重大影响。然而,由于该国目前的经济状况,这些项目存在一些风险。因此,在本研究中,使用不确定性方法和BAS方法对伊朗道路建设项目“公私合作”融资的财务风险评估进行了调查。本研究的研究人群包括23名具有金融博士学位、最低副学士学位以及在投资公司从事研究和财务咨询经验的研究人员和专家。研究结果表明,政府项目规划和实施缺乏稳定性和政治风险,增加了公路建设项目的风险,在这方面,控制公路建设项目价格波动和银行融资可以降低这些项目的风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
9.10%
发文量
18
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信