Improvement of Concrete Construction Work Performance Through Employment of Lean Logistics Principles

IF 1.8 Q3 COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS
Zuzana Strukova, Maria Kozlovska, Alena Tazikova
{"title":"Improvement of Concrete Construction Work Performance Through Employment of Lean Logistics Principles","authors":"Zuzana Strukova,&nbsp;Maria Kozlovska,&nbsp;Alena Tazikova","doi":"10.1002/eng2.13067","DOIUrl":null,"url":null,"abstract":"<p>In logistics systems, the use of methods, approaches, and management procedures with the aim of optimizing all activities has increasingly been promoted. In the case studies, the logistics of the concrete construction work during the implementation of concrete frame structures of residential building projects is analyzed. The examination of the logistics of concrete construction work was carried out using a combination of monitoring, measurement, comparison, and modeling methods. In addition to obtaining real data on the mentioned logistics of concrete construction work, by applying the Just in Time method, as one of the methods of lean logistics, the optimal logistics of ready-mix concrete transport to construction sites was simulated. In order to reveal the most significant wastages during concrete construction work, the essential parameters of real logistics were compared with the parameters of simulated optimal logistics of ready-mix concrete transport. The goal of the research is to evaluate the intensity of the application of logistics and its elements in the implementation of construction and to point out the importance of the involvement of lean production methods and thus also lean logistics in the construction industry. Based on this study results from construction projects in Slovakia and also based on the experience of the authors of this work, it can be concluded that the use of logistic management in the supply of the main construction material in the production of monolithic concrete structures is poor, and this causes a lot of unnecessary waste, having an adverse effect not only on the construction time, but also on the management of individual construction resources. It has been proven that investment in planning and management of logistics can lead to increased overall efficiency of the construction and can bring profit in the form of system, synchronization of construction process resources.</p>","PeriodicalId":72922,"journal":{"name":"Engineering reports : open access","volume":"7 1","pages":""},"PeriodicalIF":1.8000,"publicationDate":"2024-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/eng2.13067","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering reports : open access","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/eng2.13067","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"COMPUTER SCIENCE, INTERDISCIPLINARY APPLICATIONS","Score":null,"Total":0}
引用次数: 0

Abstract

In logistics systems, the use of methods, approaches, and management procedures with the aim of optimizing all activities has increasingly been promoted. In the case studies, the logistics of the concrete construction work during the implementation of concrete frame structures of residential building projects is analyzed. The examination of the logistics of concrete construction work was carried out using a combination of monitoring, measurement, comparison, and modeling methods. In addition to obtaining real data on the mentioned logistics of concrete construction work, by applying the Just in Time method, as one of the methods of lean logistics, the optimal logistics of ready-mix concrete transport to construction sites was simulated. In order to reveal the most significant wastages during concrete construction work, the essential parameters of real logistics were compared with the parameters of simulated optimal logistics of ready-mix concrete transport. The goal of the research is to evaluate the intensity of the application of logistics and its elements in the implementation of construction and to point out the importance of the involvement of lean production methods and thus also lean logistics in the construction industry. Based on this study results from construction projects in Slovakia and also based on the experience of the authors of this work, it can be concluded that the use of logistic management in the supply of the main construction material in the production of monolithic concrete structures is poor, and this causes a lot of unnecessary waste, having an adverse effect not only on the construction time, but also on the management of individual construction resources. It has been proven that investment in planning and management of logistics can lead to increased overall efficiency of the construction and can bring profit in the form of system, synchronization of construction process resources.

Abstract Image

求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
5.10
自引率
0.00%
发文量
0
审稿时长
19 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信