{"title":"Predicting maintenance cost overruns in public school buildings using a rough topological approach","authors":"Gökhan Kazar , Uğur Yiğit , Kenan Evren Boyabatlı","doi":"10.1016/j.autcon.2024.105810","DOIUrl":null,"url":null,"abstract":"<div><div>Cost overruns in maintenance projects should be monitored and effectively managed by construction professionals using proactive systems. To establish more effective proactive systems for addressing cost overruns in maintenance projects, this paper presents a topological approach for machine learning-based prediction, integrated into various machine learning models to enhance the feature selection process. Project data from 1807 public schools renovated between 2016 and 2022 was collected to test the proposed mathematical method. The results indicate that the proposed method demonstrates superior performance in 6 out of 7 machine learning algorithms and hybrid models, achieving higher accuracy. This method will enable construction professionals to establish and achieve more efficient proactive systems for managing cost problems in maintenance projects. In addition, this paper will open new doors for developing effective machine-learning models without using optimization methods for other construction issues such as time, quality, or safety.</div></div>","PeriodicalId":8660,"journal":{"name":"Automation in Construction","volume":null,"pages":null},"PeriodicalIF":9.6000,"publicationDate":"2024-10-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation in Construction","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0926580524005466","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0
Abstract
Cost overruns in maintenance projects should be monitored and effectively managed by construction professionals using proactive systems. To establish more effective proactive systems for addressing cost overruns in maintenance projects, this paper presents a topological approach for machine learning-based prediction, integrated into various machine learning models to enhance the feature selection process. Project data from 1807 public schools renovated between 2016 and 2022 was collected to test the proposed mathematical method. The results indicate that the proposed method demonstrates superior performance in 6 out of 7 machine learning algorithms and hybrid models, achieving higher accuracy. This method will enable construction professionals to establish and achieve more efficient proactive systems for managing cost problems in maintenance projects. In addition, this paper will open new doors for developing effective machine-learning models without using optimization methods for other construction issues such as time, quality, or safety.
期刊介绍:
Automation in Construction is an international journal that focuses on publishing original research papers related to the use of Information Technologies in various aspects of the construction industry. The journal covers topics such as design, engineering, construction technologies, and the maintenance and management of constructed facilities.
The scope of Automation in Construction is extensive and covers all stages of the construction life cycle. This includes initial planning and design, construction of the facility, operation and maintenance, as well as the eventual dismantling and recycling of buildings and engineering structures.