A multiobjective ϵ-constraint based approach for the robust master surgical schedule under multiple uncertainties

IF 6 2区 管理学 Q1 OPERATIONS RESEARCH & MANAGEMENT SCIENCE
Salma Makboul , Alexandru-Liviu Olteanu , Marc Sevaux
{"title":"A multiobjective ϵ-constraint based approach for the robust master surgical schedule under multiple uncertainties","authors":"Salma Makboul ,&nbsp;Alexandru-Liviu Olteanu ,&nbsp;Marc Sevaux","doi":"10.1016/j.ejor.2024.08.022","DOIUrl":null,"url":null,"abstract":"<div><div>The efficient scheduling of elective surgeries in hospitals is critical for ensuring patient satisfaction, cost-effectiveness, and overall operational efficiency. However, operating theater (OT) managers face complex and competing scheduling problems due to numerous sources of uncertainty and the impact of the proposed schedule on downstream recovery units, such as the intensive care unit (ICU). To address these challenges, this study develops a multiobjective robust planning model for the weekly Master Surgical Schedule (MSS) under multiple uncertainties. The model takes into account patient priority, assignment cost and workload balancing, while also considering the constraints of the OT, surgeon availabilities, downstream resources, and the uncertainty of surgery duration and patients’ length of stay (LOS) in the ICU. To evaluate the robust solutions, a Monte Carlo simulation is used to calculate the risk of constraint violations, and an adapted <span><math><mi>ϵ</mi></math></span>-constraint algorithm is used for the four-objective problem to compute the Pareto front and calculate the hypervolume for every degree of uncertainty. This provides a comprehensive decision tool for OT decision makers and allows for the comparison of various scenarios in terms of the number of scheduled patients, canceled patients, and the utilization rate of the OT.</div></div>","PeriodicalId":55161,"journal":{"name":"European Journal of Operational Research","volume":"320 3","pages":"Pages 682-698"},"PeriodicalIF":6.0000,"publicationDate":"2024-08-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Operational Research","FirstCategoryId":"91","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0377221724006593","RegionNum":2,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 0

Abstract

The efficient scheduling of elective surgeries in hospitals is critical for ensuring patient satisfaction, cost-effectiveness, and overall operational efficiency. However, operating theater (OT) managers face complex and competing scheduling problems due to numerous sources of uncertainty and the impact of the proposed schedule on downstream recovery units, such as the intensive care unit (ICU). To address these challenges, this study develops a multiobjective robust planning model for the weekly Master Surgical Schedule (MSS) under multiple uncertainties. The model takes into account patient priority, assignment cost and workload balancing, while also considering the constraints of the OT, surgeon availabilities, downstream resources, and the uncertainty of surgery duration and patients’ length of stay (LOS) in the ICU. To evaluate the robust solutions, a Monte Carlo simulation is used to calculate the risk of constraint violations, and an adapted ϵ-constraint algorithm is used for the four-objective problem to compute the Pareto front and calculate the hypervolume for every degree of uncertainty. This provides a comprehensive decision tool for OT decision makers and allows for the comparison of various scenarios in terms of the number of scheduled patients, canceled patients, and the utilization rate of the OT.
基于多目标[公式省略]约束的多不确定性条件下鲁棒性主手术计划方法
有效安排医院的择期手术对于确保患者满意度、成本效益和整体运营效率至关重要。然而,手术室(OT)管理人员面临着复杂且相互竞争的排程问题,这是因为存在许多不确定因素,而且拟议的排程对重症监护室(ICU)等下游恢复单元有影响。为了应对这些挑战,本研究开发了一个多目标稳健规划模型,用于在多种不确定性条件下制定每周主手术日程表(MSS)。该模型考虑到了患者优先级、分配成本和工作量平衡,同时还考虑到了加班、外科医生可用性、下游资源的限制,以及手术持续时间和患者在重症监护室住院时间(LOS)的不确定性。为了评估稳健性解决方案,我们使用蒙特卡罗模拟计算违反约束的风险,并针对四目标问题使用了一种适应性约束算法,以计算帕累托前沿,并计算每种不确定性程度下的超体积。这为加班决策者提供了一个全面的决策工具,可对各种情况下的计划病人数、取消病人数和加班利用率进行比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
European Journal of Operational Research
European Journal of Operational Research 管理科学-运筹学与管理科学
CiteScore
11.90
自引率
9.40%
发文量
786
审稿时长
8.2 months
期刊介绍: The European Journal of Operational Research (EJOR) publishes high quality, original papers that contribute to the methodology of operational research (OR) and to the practice of decision making.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信