Wei Lun Wong, Kristina Carlsson, M. Lindblad, Olivia Sjökvist, F. Huss
{"title":"Resource Requirements in a Burn Mass Casualty Event","authors":"Wei Lun Wong, Kristina Carlsson, M. Lindblad, Olivia Sjökvist, F. Huss","doi":"10.3390/ebj5030022","DOIUrl":null,"url":null,"abstract":"Burn mass casualty event occurrences are rare but will place significant burdens on any burn unit or healthcare system. Effective disaster preparedness plays a significant role in mitigating the aftermath of a burn mass casualty. The aim of this study was to assess the resource requirements during the initial two weeks of a burn mass casualty event. Eight patients in a burn mass casualty event were simulated using the Emergo Train System®. These simulated patients were matched with real historical patients treated in our burn centre, and their resource requirements were analysed. An average of eight staff is required to care for a patient per day along with almost 75 h of operating time (excluding anaesthesia and turnover time). A substantial quantity of consumables was used in the first two weeks. This study has demonstrated the substantial material consumption and staff requirements in the first two weeks of management in a burn mass casualty event. Such findings will offer valuable insight for disaster preparedness planning and resource management strategies.","PeriodicalId":72961,"journal":{"name":"European burn journal","volume":null,"pages":null},"PeriodicalIF":1.0000,"publicationDate":"2024-07-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European burn journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/ebj5030022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CRITICAL CARE MEDICINE","Score":null,"Total":0}
引用次数: 0
Abstract
Burn mass casualty event occurrences are rare but will place significant burdens on any burn unit or healthcare system. Effective disaster preparedness plays a significant role in mitigating the aftermath of a burn mass casualty. The aim of this study was to assess the resource requirements during the initial two weeks of a burn mass casualty event. Eight patients in a burn mass casualty event were simulated using the Emergo Train System®. These simulated patients were matched with real historical patients treated in our burn centre, and their resource requirements were analysed. An average of eight staff is required to care for a patient per day along with almost 75 h of operating time (excluding anaesthesia and turnover time). A substantial quantity of consumables was used in the first two weeks. This study has demonstrated the substantial material consumption and staff requirements in the first two weeks of management in a burn mass casualty event. Such findings will offer valuable insight for disaster preparedness planning and resource management strategies.