Development Of Risk-Based Policy Strategies to Improve Sustainable Investment Performance on Geothermal Working Areas in Indonesia

Anthon Sapta Putra, M. Berawi
{"title":"Development Of Risk-Based Policy Strategies to Improve Sustainable Investment Performance on Geothermal Working Areas in Indonesia","authors":"Anthon Sapta Putra, M. Berawi","doi":"10.46799/ajesh.v3i7.389","DOIUrl":null,"url":null,"abstract":"This study analyzes the influence of stakeholder decision-making strategies and policies on PT's investment performance. PLN (Persero), is Indonesia's state-owned electricity company. Indonesia has a geothermal potential of 28 GWe and aims to add 3.3 GW of installed capacity by 2030. Our analysis reveals that effective stakeholder decision-making and well-formulated policies significantly enhance investment performance. This is supported by statistical evidence, with both the t-test and F-test results showing significance (calculated t-value and F-value exceed their respective critical values, with p-values < 0.05). Enhancing these strategies and policies is crucial for meeting Indonesia's new renewable energy (NRE) targets as outlined in the 2021-2030 RUPTL.","PeriodicalId":505426,"journal":{"name":"Asian Journal of Engineering, Social and Health","volume":"112 5","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asian Journal of Engineering, Social and Health","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46799/ajesh.v3i7.389","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study analyzes the influence of stakeholder decision-making strategies and policies on PT's investment performance. PLN (Persero), is Indonesia's state-owned electricity company. Indonesia has a geothermal potential of 28 GWe and aims to add 3.3 GW of installed capacity by 2030. Our analysis reveals that effective stakeholder decision-making and well-formulated policies significantly enhance investment performance. This is supported by statistical evidence, with both the t-test and F-test results showing significance (calculated t-value and F-value exceed their respective critical values, with p-values < 0.05). Enhancing these strategies and policies is crucial for meeting Indonesia's new renewable energy (NRE) targets as outlined in the 2021-2030 RUPTL.
制定基于风险的政策战略,提高印度尼西亚地热工作区的可持续投资绩效
本研究分析了利益相关者的决策策略和政策对印尼国家电力公司投资业绩的影响。PLN (Persero) 是印度尼西亚的国有电力公司。印尼的地热潜力为 28 GWe,目标是到 2030 年增加 3.3 GW 的装机容量。我们的分析表明,有效的利益相关者决策和完善的政策可显著提高投资绩效。这一点得到了统计证据的支持,t 检验和 F 检验结果均显示出显著性(计算出的 t 值和 F 值均超过了各自的临界值,且 p 值小于 0.05)。加强这些战略和政策对于印尼实现 2021-2030 RUPTL 中概述的可再生能源(NRE)目标至关重要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信