{"title":"ANALISA PENGUATAN STRUKTUR PENAMBAHAN LANTAI BANGUNAN GEDUNG (STUDI KASUS DI DPMPTSP KAB. KUDUS)","authors":"Alim Muhroni","doi":"10.61689/jti.v5i1.547","DOIUrl":null,"url":null,"abstract":"The research was conducted in the Kudus Regency Public Services building which originally had a floor area of 1172 m2. In 2022 there will be development, so a new floor will need to be added. Where the land area cannot be used to build horizontally, add vertical floors to a 2-story building to become 3 floors. The research was carried out by testing the quality of concrete using the Hammer Test, obtaining a result of 20.75 MPa, then modeling analysis was carried out using SAP 2000 v14 software and manual calculations based on SNI 03-2847-2002, SNI 031726-2012, and SNI 1729-2015. This analysis was carried out in 3 stages, the first was an analysis of the initial conditions of the existing building, the second was an analysis of the existing structure with the additional load of the new floor, and the third analysis was with the additional load and structural strengthening. The results of the structural analysis stages 1 and 2 stated that the beam structural elements experienced overstrength (O/S) or could not withstand the additional load of the 3rd floor. With this data, structural reinforcement calculations were carried out using the concrete jacketing method with a number of longitudinal reinforcement 7D16 stirrups Ø10-100 for beams and the amount of longitudinal reinforcement 8D19 stirrups Ø10-100 and the method of strengthening with steel profile IWF 200.200.8.12.","PeriodicalId":447787,"journal":{"name":"Jurnal Teknik Indonesia","volume":"101 9","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Indonesia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.61689/jti.v5i1.547","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The research was conducted in the Kudus Regency Public Services building which originally had a floor area of 1172 m2. In 2022 there will be development, so a new floor will need to be added. Where the land area cannot be used to build horizontally, add vertical floors to a 2-story building to become 3 floors. The research was carried out by testing the quality of concrete using the Hammer Test, obtaining a result of 20.75 MPa, then modeling analysis was carried out using SAP 2000 v14 software and manual calculations based on SNI 03-2847-2002, SNI 031726-2012, and SNI 1729-2015. This analysis was carried out in 3 stages, the first was an analysis of the initial conditions of the existing building, the second was an analysis of the existing structure with the additional load of the new floor, and the third analysis was with the additional load and structural strengthening. The results of the structural analysis stages 1 and 2 stated that the beam structural elements experienced overstrength (O/S) or could not withstand the additional load of the 3rd floor. With this data, structural reinforcement calculations were carried out using the concrete jacketing method with a number of longitudinal reinforcement 7D16 stirrups Ø10-100 for beams and the amount of longitudinal reinforcement 8D19 stirrups Ø10-100 and the method of strengthening with steel profile IWF 200.200.8.12.
ANALISA PENGUATAN STRUTRKUR PENAMBAHAN LANTAI BANGUNAN GEDUNG (STUDDI KASUS DI DPMPTSP KAB. KUDUS)
这项研究是在 Kudus Regency 公共服务大楼内进行的,该大楼原来的建筑面积为 1172 平方米。2022 年将进行开发,因此需要增加一层。在土地面积无法用于横向建造的情况下,可在 2 层楼的基础上增加竖向楼层,使其成为 3 层楼。研究通过锤击试验检测混凝土质量,结果为 20.75 兆帕,然后使用 SAP 2000 v14 软件进行建模分析,并根据 SNI 03-2847-2002、SNI 031726-2012 和 SNI 1729-2015 进行手工计算。该分析分三个阶段进行,第一阶段是对现有建筑的初始条件进行分析,第二阶段是对现有结构与新楼层的附加荷载进行分析,第三阶段是对附加荷载和结构加固进行分析。第 1 和第 2 阶段的结构分析结果表明,梁结构部件出现了超强度(O/S)或无法承受第 3 层楼的额外荷载。根据这些数据,采用混凝土护筒法进行了结构加固计算,梁的纵向钢筋数量为 7D16 箍筋 Ø10-100 ,纵向钢筋数量为 8D19 箍筋 Ø10-100 ,并采用 IWF 200.200.8.12 型钢进行加固。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信