Evaluation of delays in technical approval of UK Highways Act Section 278 projects

Meghdad Bagheri, Edward Bate
{"title":"Evaluation of delays in technical approval of UK Highways Act Section 278 projects","authors":"Meghdad Bagheri, Edward Bate","doi":"10.1177/20555636241246192","DOIUrl":null,"url":null,"abstract":"This paper attempts to address the causes of delays to the legal and technical approval processes involved in the creation of agreements authorising works to public highways under s.278 Highways Act (1980) specific to Warwickshire County Council, UK, and whether the type of contract (JCT or NEC) or s.278 agreement (minor or major) has any tangible influence. A series of questionnaires and interviews were carried out on a sample group of individuals including designers, developers, construction lawyers and council engineers with extensive industry experience in relation to s.278 legal, technical, construction and adoption processes. The results revealed the key causes of delays, and therefore, the barriers to prompt and efficient approval processes, as the lack of communication between developer and local authority, inexperienced developers’ engineers, poor quality drawings and insufficient information in the local authority's design guide. These key factors are discussed and recommendations are provided to tackle these issues.","PeriodicalId":290697,"journal":{"name":"Journal of Strategic Contracting and Negotiation","volume":"22 14","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Strategic Contracting and Negotiation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/20555636241246192","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper attempts to address the causes of delays to the legal and technical approval processes involved in the creation of agreements authorising works to public highways under s.278 Highways Act (1980) specific to Warwickshire County Council, UK, and whether the type of contract (JCT or NEC) or s.278 agreement (minor or major) has any tangible influence. A series of questionnaires and interviews were carried out on a sample group of individuals including designers, developers, construction lawyers and council engineers with extensive industry experience in relation to s.278 legal, technical, construction and adoption processes. The results revealed the key causes of delays, and therefore, the barriers to prompt and efficient approval processes, as the lack of communication between developer and local authority, inexperienced developers’ engineers, poor quality drawings and insufficient information in the local authority's design guide. These key factors are discussed and recommendations are provided to tackle these issues.
对英国《公路法》第 278 条项目技术审批延误的评估
本文试图探讨英国沃里克郡议会在根据《公路法》(1980 年)第 278 条制定公共公路工程授权协议时,法律和技术审批流程出现延误的原因,以及合同类型(JCT 或 NEC)或第 278 条协议(次要或主要)是否会产生任何实际影响。我们对一组抽样人员进行了一系列问卷调查和访谈,其中包括设计师、开发商、建筑律师和议会工程师,他们在第 278 条的法律、技术、施工和采用流程方面具有丰富的行业经验。调查结果显示,开发商与地方政府之间缺乏沟通、开发商的工程师经验不足、图纸质量差以及地方政府设计指南中的信息不足是造成延误的主要原因,因此也是阻碍迅速有效的审批程序的障碍。本文讨论了这些关键因素,并提出了解决这些问题的建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信