{"title":"Implementation of Progressive Design-Build in Airport Capital Construction Projects","authors":"Phuong H.D. Nguyen, Daniel Tran, Sid Scott, Linda Konrath","doi":"10.1177/03611981241249743","DOIUrl":null,"url":null,"abstract":"Alternative contracting methods (ACMs) have been increasingly used for airport capital construction projects to explore the opportunity for achieving better cost and time savings than traditional design-bid-build. Progressive design-build (PDB), an emerging variation of design-build, stands out as a promising delivery method that promotes collaboration between project stakeholders. Although PDB has been successfully used across building, water/wastewater, and transit construction sectors, its implementation in the aviation industry is still limited because of legislative considerations, regulatory policies, and funding constraints. A research gap exists in systematically investigating current practices in implementing PDB in airport projects. The main objective of this study is to explore the selection criteria, implementation strategies, success factors, and lessons learned from using PDB for airport capital construction projects. This study employed a triangulation research methodology, including a comprehensive review of PDB guidance and manuals, an industry survey of 39 airports across the U.S., and structured interviews with 12 airport representatives. This study found that the top four criteria for selecting PDB are: flexibility to handle complexity, reducing claims, industry input on constructability, and cost control. The main benefits of using PDB for airport construction projects include improving project schedules, enhancing design control levels, and better management of project complexity and risks. This study contributes to the body of knowledge by providing insights into the current PDB practices for airport capital projects. Lessons learned from implementing PDB can help airport authorities and owners better administer and manage their projects.","PeriodicalId":309251,"journal":{"name":"Transportation Research Record: Journal of the Transportation Research Board","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transportation Research Record: Journal of the Transportation Research Board","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/03611981241249743","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Alternative contracting methods (ACMs) have been increasingly used for airport capital construction projects to explore the opportunity for achieving better cost and time savings than traditional design-bid-build. Progressive design-build (PDB), an emerging variation of design-build, stands out as a promising delivery method that promotes collaboration between project stakeholders. Although PDB has been successfully used across building, water/wastewater, and transit construction sectors, its implementation in the aviation industry is still limited because of legislative considerations, regulatory policies, and funding constraints. A research gap exists in systematically investigating current practices in implementing PDB in airport projects. The main objective of this study is to explore the selection criteria, implementation strategies, success factors, and lessons learned from using PDB for airport capital construction projects. This study employed a triangulation research methodology, including a comprehensive review of PDB guidance and manuals, an industry survey of 39 airports across the U.S., and structured interviews with 12 airport representatives. This study found that the top four criteria for selecting PDB are: flexibility to handle complexity, reducing claims, industry input on constructability, and cost control. The main benefits of using PDB for airport construction projects include improving project schedules, enhancing design control levels, and better management of project complexity and risks. This study contributes to the body of knowledge by providing insights into the current PDB practices for airport capital projects. Lessons learned from implementing PDB can help airport authorities and owners better administer and manage their projects.
在机场基本建设项目中实施渐进式设计-建设
与传统的设计-招标-建设相比,机场基本建设项目越来越多地采用替代承包方法(ACMs),以探索更好地节约成本和时间的机会。渐进式设计-建造(PDB)是设计-建造的一种新兴变体,是一种很有前途的交付方法,可促进项目利益相关者之间的合作。虽然渐进式设计-建造已成功应用于建筑、水/污水处理和交通建设领域,但由于立法考虑、监管政策和资金限制,其在航空业的实施仍然有限。在系统调查机场项目实施 PDB 的当前实践方面存在研究空白。本研究的主要目的是探讨在机场基本建设项目中使用 PDB 的选择标准、实施策略、成功因素和经验教训。本研究采用了三角研究方法,包括全面查阅 PDB 指南和手册、对全美 39 个机场进行行业调查,以及对 12 名机场代表进行结构性访谈。该研究发现,选择 PDB 的四大标准是:灵活处理复杂性、减少索赔、行业对可施工性的意见以及成本控制。在机场建设项目中使用 PDB 的主要好处包括改善项目进度、提高设计控制水平以及更好地管理项目复杂性和风险。本研究对当前机场基本建设项目的 PDB 实践进行了深入探讨,为相关知识体系做出了贡献。从实施 PDB 中汲取的经验教训可帮助机场当局和业主更好地管理其项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信