Proposing Solutions to Tackle the Issues of Slow Progress and Lack of Materials for Mekong Delta Expressway Construction Projects in Period of 2021-2025

Le Hoai Linh, Le Hoang Son, Vo Nhat Luan, Le Manh Tuong
{"title":"Proposing Solutions to Tackle the Issues of Slow Progress and Lack of Materials for Mekong Delta Expressway Construction Projects in Period of 2021-2025","authors":"Le Hoai Linh, Le Hoang Son, Vo Nhat Luan, Le Manh Tuong","doi":"10.32628/ijsrset241112","DOIUrl":null,"url":null,"abstract":"Up to now, Vietnam has spent 12 years implementing the State’s policies on building an expressway system, and has initially achieved certain promising results. However, regarding projects which have been put into operation and projects which are in the preparation phase for implementation in the Mekong Delta, there have been many major shortcomings in materials, design, traffic safety, and the environment, etc. Therefore, timely adjustments and improvements are needed to avoid unfortunate consequences and losses both in the immediate and long term. The article used the method of synthesizing research and analysis to evaluate the current status of expressway construction projects in the recent period, mainly on Mekong Delta Expressway projects, and offered 4 solutions based on a practical basis to make prompt adjustments for sustainable development of the Mekong Delta including 1) solution 1; 2) solution 2; 3) solution 3; 4) solution 4.","PeriodicalId":14228,"journal":{"name":"International Journal of Scientific Research in Science, Engineering and Technology","volume":"19 5","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Scientific Research in Science, Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32628/ijsrset241112","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Up to now, Vietnam has spent 12 years implementing the State’s policies on building an expressway system, and has initially achieved certain promising results. However, regarding projects which have been put into operation and projects which are in the preparation phase for implementation in the Mekong Delta, there have been many major shortcomings in materials, design, traffic safety, and the environment, etc. Therefore, timely adjustments and improvements are needed to avoid unfortunate consequences and losses both in the immediate and long term. The article used the method of synthesizing research and analysis to evaluate the current status of expressway construction projects in the recent period, mainly on Mekong Delta Expressway projects, and offered 4 solutions based on a practical basis to make prompt adjustments for sustainable development of the Mekong Delta including 1) solution 1; 2) solution 2; 3) solution 3; 4) solution 4.
为解决 2021-2025 年期间湄公河三角洲高速公路建设项目进展缓慢和物资匮乏问题提出解决方案
迄今为止,越南已用 12 年的时间落实了国家关于建设高速公路系统的政策,并初步取得了一些可喜的成果。但是,湄公河三角洲地区已投入使用的项目和正在准备实施的项目,在材料、设计、交通安全、环境等方面都存在许多重大缺陷。因此,需要及时调整和改进,以避免近期和远期的不幸后果和损失。文章采用综合研究分析的方法,以湄公河三角洲高速公路项目为中心,对近期高速公路建设项目的现状进行了评估,并从实际出发,提出了四种解决方案,以便为湄公河三角洲的可持续发展做出及时调整,包括:1)解决方案 1;2)解决方案 2;3)解决方案 3;4)解决方案 4。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信